IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v78y2002i3p271-285.html
   My bibliography  Save this article

Modelling flow and jobbing shops as a queueing network for workload control

Author

Listed:
  • Haskose, A.
  • Kingsman, B. G.
  • Worthington, D.

Abstract

No abstract is available for this item.

Suggested Citation

  • Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.
  • Handle: RePEc:eee:proeco:v:78:y:2002:i:3:p:271-285
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(01)00117-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Altiok, Tayfur, 1982. "Approximate analysis of exponential tandem queues with blocking," European Journal of Operational Research, Elsevier, vol. 11(4), pages 390-398, December.
    2. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    3. דליה גורדון ותמר אליאב, 1992. "משפחות חד הוריות, 1991," Working Papers 539, National Insurance Institute of Israel.
    4. Tatsiopoulos, I. P. & Kingsman, B. G., 1983. "Lead time management," European Journal of Operational Research, Elsevier, vol. 14(4), pages 351-358, December.
    5. אסתר טולידנו, 1993. "מקבלי דמי אבטלה בשנת 1992," Working Papers 475, National Insurance Institute of Israel.
    6. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    7. James R. Jackson, 1963. "Jobshop-Like Queueing Systems," Management Science, INFORMS, vol. 10(1), pages 131-142, October.
    8. Unknown, 1986. "Letters," Choices: The Magazine of Food, Farm, and Resource Issues, Agricultural and Applied Economics Association, vol. 1(4), pages 1-9.
    9. James R. Jackson, 1957. "Networks of Waiting Lines," Operations Research, INFORMS, vol. 5(4), pages 518-521, August.
    10. Altiok, Tayfur & Ranjan, Raghav, 1989. "Analysis of production lines with general service times and finite buffers: A two-node decomposition approach," Engineering Costs and Production Economics, Elsevier, vol. 17(1-4), pages 155-165, August.
    11. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    12. Alexandre Brandwajn & Yung-Li Lily Jow, 1988. "An Approximation Method for Tandem Queues with Blocking," Operations Research, INFORMS, vol. 36(1), pages 73-83, February.
    13. אסתר טולידנו, 1992. "מקבלי דמי אבטלה בשנת 1991," Working Papers 563, National Insurance Institute of Israel.
    14. H.S. Lee & A. Bouhchouch & Y. Dallery & Y. Frein, 1998. "Performance evaluation of open queueing networks with arbitrary configuration and finite buffers," Annals of Operations Research, Springer, vol. 79(0), pages 181-206, January.
    15. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    16. תמר אליאב ולאה ענבר, 1992. "גמלאות אמהות 1990/91," Working Papers 519, National Insurance Institute of Israel.
    17. Jun, Kyung P. & Perros, Harry G., 1990. "An approximate analysis of open tandem queueing networks with blocking and general service times," European Journal of Operational Research, Elsevier, vol. 46(1), pages 123-135, May.
    18. Hyo-Seong Lee & Stephen M. Pollock, 1990. "Approximation Analysis of Open Acyclic Exponential Queueing Networks with Blocking," Operations Research, INFORMS, vol. 38(6), pages 1123-1134, December.
    19. אסתר טולידנו, 1994. "מקבלי דמי אבטלה בשנת 1993," Working Papers 439, National Insurance Institute of Israel.
    20. Tayfur Altiok, 1989. "Approximate Analysis of Queues in Series with Phase-Type Service Times and Blocking," Operations Research, INFORMS, vol. 37(4), pages 601-610, August.
    21. שרית בייץ מוראי & תמר הרון ורבקה ורטמן, 1993. "ביצוע חוק סיעוד במרכזי יום," Working Papers 456, National Insurance Institute of Israel.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Perkgoz, Cahit & Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2007. "A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms," European Journal of Operational Research, Elsevier, vol. 180(1), pages 292-308, July.
    2. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
    3. Hui-Yu Zhang & Qing-Xin Chen & James MacGregor Smith & Ning Mao & Ai-Lin Yu & Zhan-Tao Li, 2017. "Performance analysis of open general queuing networks with blocking and feedback," International Journal of Production Research, Taylor & Francis Journals, vol. 55(19), pages 5760-5781, October.
    4. J Ou & M Parlar & M Sharafali, 2006. "A differentiated service scheme to optimize website revenues," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(11), pages 1323-1340, November.
    5. Van Nyen, Pieter L. M. & Van Ooijen, Henny P. G. & Bertrand, J.W.M.J. Will M., 2004. "Simulation results on the performance of Albin and Whitt's estimation method for waiting times in integrated production-inventory systems," International Journal of Production Economics, Elsevier, vol. 90(2), pages 237-249, July.
    6. Macarena Lozano & Pilar Moreno, 2008. "A discrete time single-server queue with balking: economic applications," Applied Economics, Taylor & Francis Journals, vol. 40(6), pages 735-748.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    2. Osorio, Carolina & Bierlaire, Michel, 2009. "An analytic finite capacity queueing network model capturing the propagation of congestion and blocking," European Journal of Operational Research, Elsevier, vol. 196(3), pages 996-1007, August.
    3. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
    4. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    5. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    6. Pennings, Enrico & Natter, Martin, 2001. "Strategic diversification and capacity utilization," International Journal of Production Economics, Elsevier, vol. 72(3), pages 261-272, August.
    7. Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo, 2001. "Optimal multiple delivery schedule for demand in logistic model," International Journal of Production Economics, Elsevier, vol. 73(3), pages 241-249, October.
    8. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    9. Osorio, Carolina & Wang, Carter, 2017. "On the analytical approximation of joint aggregate queue-length distributions for traffic networks: A stationary finite capacity Markovian network approach," Transportation Research Part B: Methodological, Elsevier, vol. 95(C), pages 305-339.
    10. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    11. Baker, Rose D., 2000. "Calculating the expected failure rate of complex equipment subject to hazardous repair," International Journal of Production Economics, Elsevier, vol. 67(1), pages 53-61, August.
    12. Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
    13. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    14. Heidenberger, Kurt & Schillinger, Alexander & Stummer, Christian, 2003. "Budgeting for research and development: a dynamic financial simulation approach," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 15-27, March.
    15. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    16. Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
    17. Korporaal, R. & Ridder, A.A.N. & Kloprogge, P. & Dekker, R., 1999. "Capacity planning of prisons in the Netherlands," Econometric Institute Research Papers EI 9909-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    18. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    19. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    20. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:78:y:2002:i:3:p:271-285. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.