IDEAS home Printed from https://ideas.repec.org/p/ems/eureir/10346.html
   My bibliography  Save this paper

Railway timetabling from an operations research

Author

Listed:
  • Kroon, L.G.
  • Huisman, D.
  • Maróti, G.

Abstract

In this paper we describe Operations Research (OR) models and techniques that can be used for determining (cyclic) railway timetables. We discuss the two aspects of railway timetabling: ($i$) the determination of arrival and departure times of the trains at the stations and other relevant locations such as junctions and bridges, and ($ii$) the assignment of each train to an appropriate platform and corresponding inbound and outbound routes in every station. Moreover, we discuss robustness aspects of both subproblems.

Suggested Citation

  • Kroon, L.G. & Huisman, D. & Maróti, G., 2007. "Railway timetabling from an operations research," Econometric Institute Research Papers EI 2007-22, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
  • Handle: RePEc:ems:eureir:10346
    as

    Download full text from publisher

    File URL: https://repub.eur.nl/pub/10346/ei200722.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Jurjen S. Hooghiemstra & Leo G. Kroon & Michiel A. Odijk & Marc Salomon & Peter J. Zwaneveld, 1999. "Decision Support Systems Support the Search for Win-Win Solutions in Railway Network Design," Interfaces, INFORMS, vol. 29(2), pages 15-32, April.
    2. Dennis Huisman & Leo G. Kroon & Ramon M. Lentink & Michiel J. C. M. Vromans, 2005. "Operations Research in passenger railway transportation," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 59(4), pages 467-497, November.
    3. Gabrio Caimi & Dan Burkolter & Thomas Herrmann, 2005. "Finding Delay-Tolerant Train Routings through Stations," Operations Research Proceedings, in: Hein Fleuren & Dick Hertog & Peter Kort (ed.), Operations Research Proceedings 2004, pages 136-143, Springer.
    4. Fioole, Pieter-Jan & Kroon, Leo & Maroti, Gabor & Schrijver, Alexander, 2006. "A rolling stock circulation model for combining and splitting of passenger trains," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1281-1297, October.
    5. Alberto Caprara & Matteo Fischetti & Paolo Toth, 2002. "Modeling and Solving the Train Timetabling Problem," Operations Research, INFORMS, vol. 50(5), pages 851-861, October.
    6. Erwin Abbink & Matteo Fischetti & Leo Kroon & Gerrit Timmer & Michiel Vromans, 2005. "Reinventing Crew Scheduling at Netherlands Railways," Interfaces, INFORMS, vol. 35(5), pages 393-401, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hanne L. Petersen & Allan Larsen & Oli B. G. Madsen & Bjørn Petersen & Stefan Ropke, 2013. "The Simultaneous Vehicle Scheduling and Passenger Service Problem," Transportation Science, INFORMS, vol. 47(4), pages 603-616, November.
    2. Fonseca, João Paiva & van der Hurk, Evelien & Roberti, Roberto & Larsen, Allan, 2018. "A matheuristic for transfer synchronization through integrated timetabling and vehicle scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 109(C), pages 128-149.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kroon, L.G. & Huisman, D. & Abbink, E.J.W. & Fioole, P-J. & Fischetti, M. & Maróti, G. & Schrijver, A. & Steenbeek, A. & Ybema, R., 2008. "The new Dutch timetable: The OR revolution," Econometric Institute Research Papers EI 2008-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Leo Kroon & Dennis Huisman & Erwin Abbink & Pieter-Jan Fioole & Matteo Fischetti & Gábor Maróti & Alexander Schrijver & Adri Steenbeek & Roelof Ybema, 2009. "The New Dutch Timetable: The OR Revolution," Interfaces, INFORMS, vol. 39(1), pages 6-17, February.
    3. Andrea D'Ariano & Francesco Corman & Dario Pacciarelli & Marco Pranzo, 2008. "Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time," Transportation Science, INFORMS, vol. 42(4), pages 405-419, November.
    4. Lusby, Richard M. & Larsen, Jesper & Bull, Simon, 2018. "A survey on robustness in railway planning," European Journal of Operational Research, Elsevier, vol. 266(1), pages 1-15.
    5. Jespersen-Groth, J. & Potthoff, D. & Clausen, J. & Huisman, D. & Kroon, L.G. & Maróti, G. & Nielsen, M.N., 2007. "Disruption management in passenger railway transportation," Econometric Institute Research Papers EI 2007-05, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Zhang, Yongxiang & Peng, Qiyuan & Yao, Yu & Zhang, Xin & Zhou, Xuesong, 2019. "Solving cyclic train timetabling problem through model reformulation: Extended time-space network construct and Alternating Direction Method of Multipliers methods," Transportation Research Part B: Methodological, Elsevier, vol. 128(C), pages 344-379.
    7. Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
    8. Fuentes, Manuel & Cadarso, Luis & Marín, Ángel, 2019. "A hybrid model for crew scheduling in rail rapid transit networks," Transportation Research Part B: Methodological, Elsevier, vol. 125(C), pages 248-265.
    9. Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
    10. Kroon, L.G. & Huisman, D., 2011. "Algorithmic Support for Disruption Management at Netherlands Railways," Econometric Institute Research Papers EI 2011-06, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    11. Xueqiao Yu & Maoxiang Lang & Wenhui Zhang & Shiqi Li & Mingyue Zhang & Xiao Yu, 2019. "An Empirical Study on the Comprehensive Optimization Method of a Train Diagram of the China High Speed Railway Express," Sustainability, MDPI, vol. 11(7), pages 1-30, April.
    12. Abbink, E.J.W., 2008. "Solving large scale crew scheduling problems by using iterative partitioning," Econometric Institute Research Papers EI 2008-03, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    13. Wenliang Zhou & Xiaorong You & Wenzhuang Fan, 2020. "A Mixed Integer Linear Programming Method for Simultaneous Multi-Periodic Train Timetabling and Routing on a High-Speed Rail Network," Sustainability, MDPI, vol. 12(3), pages 1-34, February.
    14. Budai-Balke, G. & Maróti, G. & Dekker, R. & Huisman, D. & Kroon, L.G., 2007. "Re-scheduling in railways: the rolling stock balancing problem," Econometric Institute Research Papers EI 2007-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    15. Breugem, T. & Dollevoet, T.A.B. & Huisman, D., 2017. "Is Equality always desirable?," Econometric Institute Research Papers EI2017-30, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    16. Cacchiani, Valentina & Furini, Fabio & Kidd, Martin Philip, 2016. "Approaches to a real-world Train Timetabling Problem in a railway node," Omega, Elsevier, vol. 58(C), pages 97-110.
    17. Juraj Čamaj & Eva Brumerčíková & Michal Petr Hranický, 2020. "Information System and Technology Optimization as a Tool for Ensuring the Competitiveness of a Railway Undertaking—Case Study," Sustainability, MDPI, vol. 12(21), pages 1-23, October.
    18. Abbink, E.J.W. & Albino, L. & Dollevoet, T.A.B. & Huisman, D. & Roussado, J. & Saldanha, R.L., 2010. "Solving Large Scale Crew Scheduling Problems in Practice," Econometric Institute Research Papers EI 2010-63, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    19. Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
    20. Valentina Cacchiani & Alberto Caprara & Paolo Toth, 2019. "An Effective Peak Period Heuristic for Railway Rolling Stock Planning," Transportation Science, INFORMS, vol. 53(3), pages 746-762, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:10346. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.