Advanced Search
MyIDEAS: Login to save this paper or follow this series

Evolution of India’s Electricity Market Deregulation and Private Sector Investment in the Power Sector(withdrawn for review)

Contents:

Author Info

Registered author(s):

    Abstract

    The 11th India’s Economic Development Plan (2007-12) proposes a very ambitious goal of “Power for all”: supplying electricity to all Indian households without interruption by the end of the Plan in 2012. Currently, the potential demand for electricity in India exceeds supply by about 15%, resulting in regular power cuts for households, businesses and industries. The 11th Plan anticipates the generation capacity to surpass 225 GW in 2012, requiring investment of approximately US$175-215 billion: 60% of which will be invested in adding new generation capacity and the rest 40% will be directed towards the transmission and distribution (T&D) infrastructure. The ambitious goal of $175-215 billion investment in electricity sector in the 11th plan (2007-2012) and estimated roughly $300 billion investment for 2012-2017 seems to be a right step for sustaining high economic growth. This creates major economic opportunities for domestic and international investors and project developers. This paper presents a summary of the evolution of power sector market reforms and their implications for the private sector investment. The paper first analyzes the electricity markets, regulations, and generation in India, with emphasis on assessing the options available to enhance the economic efficiency, and then moves forward to empirically testing the two hypothesized models. The paper then reports on an empirical assessment of the effects of domestic credit, interest rates, inflation, exchange rate, and current account balance on the gross capital formation and investment responsiveness in the electricity sector. Study results show that the availability of domestic credit normally exerts a significant and strong positive influence on both the gross capital formation and electricity investments by Independent Power Producers. Interest rate and inflation have significantly negative influences on the private sector investment in the power sector. Thus to accelerate private investment in this sector, Indian governments need to address the macroeconomic issues, or at least take measures to mitigate their adverse impacts on electricity sector investments. Also, the governments need to address the issues of electricity sector market, institutional and structural reforms in order to increase power generation and transmission capacities for meeting electricity demands, accelerating economic growth, creating jobs and achieving environmental sustainability.

    Download Info

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below under "Related research" whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Bibliographic Info

    Paper provided by Carleton University, Department of Economics in its series Carleton Economic Papers with number 11-08.

    as in new window
    Length: 23 pages
    Date of creation: 17 Oct 2011
    Date of revision:
    Publication status: Published: Carleton Economic Papers
    Handle: RePEc:car:carecp:11-08

    Contact details of provider:
    Postal: 1125 Colonel By Drive, Ottawa Ontario, K1S 5B6 Canada
    Phone: 1-613-520-3744
    Fax: 1-613-520-3906

    Order Information:
    Email:

    Related research

    Keywords:

    References

    References listed on IDEAS
    Please report citation or reference errors to , or , if you are the registered author of the cited work, log in to your RePEc Author Service profile, click on "citations" and make appropriate adjustments.:
    as in new window
    1. Singh, Anoop, 2006. "Power sector reform in India: current issues and prospects," Energy Policy, Elsevier, vol. 34(16), pages 2480-2490, November.
    2. Sharma, D. Parameswara & Nair, P. S. Chandramohanan & Balasubramanian, R., 2005. "Performance of Indian power sector during a decade under restructuring: a critique," Energy Policy, Elsevier, vol. 33(4), pages 563-576, March.
    3. Singh, Anoop, 2010. "Towards a competitive market for electricity and consumer choice in the Indian power sector," Energy Policy, Elsevier, vol. 38(8), pages 4196-4208, August.
    4. Bhattacharya, Soma & Cropper, Maureen L., 2010. "Options for Energy Efficiency in India and Barriers to Their Adoption: A Scoping Study," Discussion Papers dp-10-20, Resources For the Future.
    Full references (including those not matched with items on IDEAS)

    Citations

    Lists

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    Statistics

    Access and download statistics

    Corrections

    When requesting a correction, please mention this item's handle: RePEc:car:carecp:11-08. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Renee Lortie).

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.