IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v67y2020i4p254-271.html
   My bibliography  Save this article

Optimal redesign decisions through failure rate estimates

Author

Listed:
  • Qianru Ge
  • Willem van Jaarsveld
  • Zümbül Atan

Abstract

To reduce the time‐to‐market of newly developed systems, manufacturers increasingly adopt strategies where systems are brought to market while system field reliability is still uncertain. These systems are typically sold under performance‐based contracts, which incentivizes potential customers to invest in them despite reliability uncertainty. Such contracts make the manufacturer (partly) responsible for the availability of the system. Subsequently, when field reliability is lower than anticipated, the manufacturer may choose to redesign the system to avoid high contract penalties. Redesign is a costly effort which may substantially increase field reliability. Deciding when to redesign is challenging, especially because the initial failure rate estimate by the system's engineers is refined over time as failure data accrues. We propose a model that endogenizes the failure rate updating to analyze this tactical redesign decision. We study additive and multiplicative redesigns and show that the optimal policy has a control limit structure. We benchmark our optimal policy against a static counterpart numerically, and conclude that basing redesign decisions on the updated estimate of the failure rate can substantially reduce costs.

Suggested Citation

  • Qianru Ge & Willem van Jaarsveld & Zümbül Atan, 2020. "Optimal redesign decisions through failure rate estimates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(4), pages 254-271, June.
  • Handle: RePEc:wly:navres:v:67:y:2020:i:4:p:254-271
    DOI: 10.1002/nav.21904
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/nav.21904
    Download Restriction: no

    File URL: https://libkey.io/10.1002/nav.21904?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine & Senthil Veeraraghavan, 2010. "Contracting for Infrequent Restoration and Recovery of Mission-Critical Systems," Management Science, INFORMS, vol. 56(9), pages 1551-1567, September.
    2. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    3. Nitin Bakshi & Sang-Hyun Kim & Nicos Savva, 2015. "Signaling New Product Reliability with After-Sales Service Contracts," Management Science, INFORMS, vol. 61(8), pages 1812-1829, August.
    4. Jayant Rajgopal & Mainak Mazumdar, 1997. "Minimum cost component test plans for evaluating reliability of a highly reliable parallel system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(5), pages 401-418, August.
    5. Sophie Mercier, 2008. "Optimal replacement policy for obsolete components with general failure rates," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 24(3), pages 221-235, May.
    6. Jen Tang & Kwei Tang & Herbert Moskowitz, 1997. "Exact bayesian estimation of system reliability from component test data," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 127-146, February.
    7. Michael R. Dugas & Francisco J. Samaniego, 2007. "On optimal system designs in reliability‐economics frameworks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 568-582, August.
    8. Aronis, Kostas-Platon & Magou, Ioulia & Dekker, Rommert & Tagaras, George, 2004. "Inventory control of spare parts using a Bayesian approach: A case study," European Journal of Operational Research, Elsevier, vol. 154(3), pages 730-739, May.
    9. Si, Xiao-Sheng & Wang, Wenbin & Chen, Mao-Yin & Hu, Chang-Hua & Zhou, Dong-Hua, 2013. "A degradation path-dependent approach for remaining useful life estimation with an exact and closed-form solution," European Journal of Operational Research, Elsevier, vol. 226(1), pages 53-66.
    10. Wang, Yong & Li, Lin & Huang, Shuhong & Chang, Qing, 2012. "Reliability and covariance estimation of weighted k-out-of-n multi-state systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 138-147.
    11. T Jin & P Wang, 2012. "Planning performance based contracts considering reliability and uncertain system usage," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 63(10), pages 1467-1478, October.
    12. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2010. "Optimization of component reliability in the design phase of capital goods," European Journal of Operational Research, Elsevier, vol. 205(3), pages 615-624, September.
    13. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    14. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.
    15. Kurtuluş Barış Öner & Alan Scheller-Wolf & Geert-Jan van Houtum, 2013. "Redundancy Optimization for Critical Components in High-Availability Technical Systems," Operations Research, INFORMS, vol. 61(1), pages 244-264, February.
    16. Ramirez-Marquez, Jose Emmanuel & Levitin, Gregory, 2008. "Algorithm for estimating reliability confidence bounds of multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 93(8), pages 1231-1243.
    17. Sophie Mercier & Pierre‐Etienne Labeau, 2004. "Optimal replacement policy for a series system with obsolescence," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 20(1), pages 73-91, January.
    18. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    2. Ge, Qianru & Peng, Hao & van Houtum, Geert-Jan & Adan, Ivo, 2018. "Reliability optimization for series systems under uncertain component failure rates in the design phase," International Journal of Production Economics, Elsevier, vol. 196(C), pages 163-175.
    3. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    4. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    5. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    6. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    7. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    8. Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.
    9. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    10. Dong Li & Nishant Mishra & Serguei Netessine, 2023. "Contracting for Product Support Under Information Asymmetry," Management Science, INFORMS, vol. 69(8), pages 4627-4645, August.
    11. Wang, Yulan & Wallace, Stein W. & Shen, Bin & Choi, Tsan-Ming, 2015. "Service supply chain management: A review of operational models," European Journal of Operational Research, Elsevier, vol. 247(3), pages 685-698.
    12. Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
    13. Li, Dong, 2020. "When less is more: Recovery technology investment and segmentation for uptime-centered services," European Journal of Operational Research, Elsevier, vol. 286(1), pages 267-281.
    14. Vibhuti Dhingra & Harish Krishnan, 2021. "Managing Reputation Risk in Supply Chains: The Role of Risk Sharing Under Limited Liability," Management Science, INFORMS, vol. 67(8), pages 4845-4862, August.
    15. Li, Dong & Mishra, Nishant, 2021. "Engaging suppliers for reliability improvement under outcome-based compensations," Omega, Elsevier, vol. 102(C).
    16. Nicos Savva & Tolga Tezcan & Özlem Yıldız, 2019. "Can Yardstick Competition Reduce Waiting Times?," Management Science, INFORMS, vol. 65(7), pages 3196-3215, July.
    17. Lamghari-Idrissi, Douniel & Basten, Rob & van Houtum, Geert-Jan, 2020. "Spare parts inventory control under a fixed-term contract with a long-down constraint," International Journal of Production Economics, Elsevier, vol. 219(C), pages 123-137.
    18. Huber, Sebastian & Spinler, Stefan, 2012. "Pricing of full-service repair contracts," European Journal of Operational Research, Elsevier, vol. 222(1), pages 113-121.
    19. Jiang, Zhong-Zhong & Feng, Guangqi & Yi, Zelong, 2021. "How should a capital-constrained servicizing manufacturer search for financing? The impact of supply chain leadership," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 145(C).
    20. Kanatlı, Mehmet Ali & Karaer, Özgen, 2022. "Servitization as an alternative business model and its implications on product durability, profitability & environmental impact," European Journal of Operational Research, Elsevier, vol. 301(2), pages 546-560.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:67:y:2020:i:4:p:254-271. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.