Optimal assignment of high multiplicity flight plans to dispatchers

Author

Listed:
  • A. Agnetis
  • S. Smriglio

Abstract

This paper addresses the problem of finding a feasible schedule of n jobs on m parallel machines, where each job has a deadline and some jobs are preassigned to some machine. This problem arises in the daily assignment of workload to a set of flight dispatchers, and it is strongly characterized by the fact that the job lengths may assume one out of k different values, for small k. We prove the problem to be NP‐complete for k = 2 and propose an effective implicit enumeration algorithm which allows efficiently solution a set of real‐life instances. © 2000 John Wiley & Sons, Inc. Naval Research Logistics 47: 359–376, 2000

Suggested Citation

  • A. Agnetis & S. Smriglio, 2000. "Optimal assignment of high multiplicity flight plans to dispatchers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(5), pages 359-376, August.
  • Handle: RePEc:wly:navres:v:47:y:2000:i:5:p:359-376
    DOI: 10.1002/1520-6750(200008)47:53.0.CO;2-J
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(200008)47:53.0.CO;2-J
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(200008)47:53.0.CO;2-J?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Dorit S. Hochbaum & Ron Shamir, 1991. "Strongly Polynomial Algorithms for the High Multiplicity Scheduling Problem," Operations Research, INFORMS, vol. 39(4), pages 648-653, August.
    2. Joseph Y.-T. Leung, 1982. "On Scheduling Independent Tasks with Restricted Execution Times," Operations Research, INFORMS, vol. 30(1), pages 163-171, February.
    3. Ho, Johnny C. & Chang, Yih-Long, 1995. "Minimizing the number of tardy jobs for m parallel machines," European Journal of Operational Research, Elsevier, vol. 84(2), pages 343-355, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. S. Thomas McCormick & Scott R. Smallwood & Frits C. R. Spieksma, 2001. "A Polynomial Algorithm for Multiprocessor Scheduling with Two Job Lengths," Mathematics of Operations Research, INFORMS, vol. 26(1), pages 31-49, February.
    2. Wang, Xiuli & Cheng, T.C.E., 2015. "A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint," International Journal of Production Economics, Elsevier, vol. 161(C), pages 74-82.
    3. Fang Lu & John J. Hasenbein & David P. Morton, 2016. "Modeling and Optimization of a Spatial Detection System," INFORMS Journal on Computing, INFORMS, vol. 28(3), pages 512-526, August.
    4. Gupta, Jatinder N. D. & Ho, Johnny C., 1996. "Scheduling with two job classes and setup times to minimize the number of tardy jobs," International Journal of Production Economics, Elsevier, vol. 42(3), pages 205-216, April.
    5. N. Brauner & Y. Crama & A. Grigoriev & J. Klundert, 2005. "A Framework for the Complexity of High-Multiplicity Scheduling Problems," Journal of Combinatorial Optimization, Springer, vol. 9(3), pages 313-323, May.
    6. Klaus Jansen & Roberto Solis-Oba, 2011. "A Polynomial Time OPT + 1 Algorithm for the Cutting Stock Problem with a Constant Number of Object Lengths," Mathematics of Operations Research, INFORMS, vol. 36(4), pages 743-753, November.
    7. Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
    8. Choi, Byung-Cheon & Briskorn, Dirk & Lee, Kangbok & Leung, Joseph & Pinedo, Michael, 2008. "Allocating containers to ships with fixed departure times," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 641, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    9. John J. Clifford & Marc E. Posner, 2000. "High Multiplicity in Earliness-Tardiness Scheduling," Operations Research, INFORMS, vol. 48(5), pages 788-800, October.
    10. Bampis, Evripidis & Giannakos, Aristotelis & Konig, Jean-Claude, 1996. "On the complexity of scheduling with large communication delays," European Journal of Operational Research, Elsevier, vol. 94(2), pages 252-260, October.
    11. Sterna, Małgorzata, 2021. "Late and early work scheduling: A survey," Omega, Elsevier, vol. 104(C).
    12. Sterna, Malgorzata, 2011. "A survey of scheduling problems with late work criteria," Omega, Elsevier, vol. 39(2), pages 120-129, April.
    13. Vergauwen, P.G.M.C. & Busser, K. & Rongen, P. & Verwaijen, R. & Vossen, D.J.L.H., 2001. "Cost accounting and pricing improvement at Helmond Print: using Xeikon digital colour printing equipment: a case study," Research Memorandum 028, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    14. Cheng, T.C.E. & Shafransky, Y. & Ng, C.T., 2016. "An alternative approach for proving the NP-hardness of optimization problems," European Journal of Operational Research, Elsevier, vol. 248(1), pages 52-58.
    15. Omri Dover & Dvir Shabtay, 2016. "Single machine scheduling with two competing agents, arbitrary release dates and unit processing times," Annals of Operations Research, Springer, vol. 238(1), pages 145-178, March.
    16. Pereira Lopes, Manuel J. & de Carvalho, J.M. Valerio, 2007. "A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1508-1527, February.
    17. Jinwen Ou & Joseph Y.‐T. Leung & Chung‐Lun Li, 2008. "Scheduling parallel machines with inclusive processing set restrictions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(4), pages 328-338, June.
    18. Christoph Hertrich & Christian Weiß & Heiner Ackermann & Sandy Heydrich & Sven O. Krumke, 2020. "Scheduling a proportionate flow shop of batching machines," Journal of Scheduling, Springer, vol. 23(5), pages 575-593, October.
    19. Bornstein, Claudio Thomas & Alcoforado, Luciane Ferreira & Maculan, Nelson, 2005. "A graph-oriented approach for the minimization of the number of late jobs for the parallel machines scheduling problem," European Journal of Operational Research, Elsevier, vol. 165(3), pages 649-656, September.
    20. Ruiz-Torres, Alex J. & Lopez, Francisco J. & Ho, Johnny C., 2007. "Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 179(2), pages 302-315, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:47:y:2000:i:5:p:359-376. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.