IDEAS home Printed from https://ideas.repec.org/a/vrs/founma/v12y2020i1p71-84n6.html
   My bibliography  Save this article

Proactive Planning of Project Team Members’ Competences

Author

Listed:
  • Szwarc Eryk

    (Koszalin University of Technology, Faculty of Electronics and Computer Science, Koszalin, Poland)

  • Wikarek Jarosław

    (Kielce University of Technology, Institute of Management and Control Systems, Kielce, Poland)

Abstract

Among the many factors that cause project delays or cancellations are disruptions, that is, unforeseen events occurring during the implementation of a project, which postpone or interrupt the performance of project activities. Examples of disruptions include employee absenteeism, addition of new activities, and others. One way to deal with this type of events is to predict potential disruptions and prepare redundant resources to be used should a disruption occur (proactive approach). The focus of the present paper are human resources, in particular redundant project team competence frameworks, which allow to continue work on a project in the event of a disruption. Previous studies on planning competence frameworks regard insensitivity (robustness) to one type of disruption, caused by employee absenteeism (an absence of one, two, or three employees). The goal of this article is to present a proactive procedure that allows to seek competence frameworks robust to two types of disruptions: absence of one employee and addition of new activities not included in the project plan. Examples are provided to illustrate how the proposed approach can be used in practice.

Suggested Citation

  • Szwarc Eryk & Wikarek Jarosław, 2020. "Proactive Planning of Project Team Members’ Competences," Foundations of Management, Sciendo, vol. 12(1), pages 71-84, January.
  • Handle: RePEc:vrs:founma:v:12:y:2020:i:1:p:71-84:n:6
    DOI: 10.2478/fman-2020-0006
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/fman-2020-0006
    Download Restriction: no

    File URL: https://libkey.io/10.2478/fman-2020-0006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. D. Sampson & D. Fytros, 2008. "Competence Models in Technology-Enhanced Competence-Based Learning," International Handbooks on Information Systems, in: Heimo H. Adelsberger & Kinshuk & Jan M. Pawlowski & Demetrios G. Sampson (ed.), Handbook on Information Technologies for Education and Training, edition 2, chapter 9, pages 155-177, Springer.
    2. G Zhu & J F Bard & G Yu, 2005. "Disruption management for resource-constrained project scheduling," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(4), pages 365-381, April.
    3. Anna Antczak & Barbara A. Sypniewska, 2017. "Cross-Cultural Personal Selling," Springer Books, Springer, number 978-3-319-55577-5, September.
    4. Ingels, Jonas & Maenhout, Broos, 2019. "Optimised buffer allocation to construct stable personnel shift rosters," Omega, Elsevier, vol. 82(C), pages 102-117.
    5. Vaagen, Hajnalka & Kaut, Michal & Wallace, Stein W., 2017. "The impact of design uncertainty in engineer-to-order project planning," European Journal of Operational Research, Elsevier, vol. 261(3), pages 1098-1109.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
    2. Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
    3. Kaut, Michal & Vaagen, Hajnalka & Wallace, Stein W., 2021. "The combined impact of stochastic and correlated activity durations and design uncertainty on project plans," International Journal of Production Economics, Elsevier, vol. 233(C).
    4. Zaharah Abd Aziz & Rahimah Jamaluddin & Suhaida Abdul Kadir, 2021. "The Relationship between Learning Motivation and Competency-Based Learning with Fashion Designing Skills for Fashion Design Programme Students at Vocational College," International Journal of Human Resource Studies, Macrothink Institute, vol. 11(4S), pages 259273-2592, December.
    5. Neumann, Anas & Hajji, Adnene & Rekik, Monia & Pellerin, Robert, 2022. "A model for advanced planning systems dedicated to the Engineer-To-Order context," International Journal of Production Economics, Elsevier, vol. 252(C).
    6. Deblaere, Filip & Demeulemeester, Erik & Herroelen, Willy, 2011. "Proactive policies for the stochastic resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 214(2), pages 308-316, October.
    7. Narjes Sabeghi & Hamed Reza Tareghian, 2020. "Using the generalized maximum covering location model to control a project’s progress," Computational Management Science, Springer, vol. 17(1), pages 1-21, January.
    8. Xingmei Li & Yaxian Wang & Qingyou Yan & Xinchao Zhao, 2019. "Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility," Fuzzy Optimization and Decision Making, Springer, vol. 18(1), pages 37-56, March.
    9. Gedik, Ridvan & Medal, Hugh & Rainwater, Chase & Pohl, Ed A. & Mason, Scott J., 2014. "Vulnerability assessment and re-routing of freight trains under disruptions: A coal supply chain network application," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 71(C), pages 45-57.
    10. Chen Li & Xiangtong Qi & Chung-Yee Lee, 2015. "Disruption Recovery for a Vessel in Liner Shipping," Transportation Science, INFORMS, vol. 49(4), pages 900-921, November.
    11. Eryk Szwarc & Grzegorz Bocewicz & Paulina Golińska-Dawson & Zbigniew Banaszak, 2023. "Proactive Operations Management: Staff Allocation with Competence Maintenance Constraints," Sustainability, MDPI, vol. 15(3), pages 1-20, January.
    12. Xuejun Hu & Jianjiang Wang & Kaijun Leng, 2019. "The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 36(03), pages 1-22, June.
    13. Iyer K. Chandrashekhar & Banerjee Partha S., 2016. "Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1464-1481, December.
    14. Fernanda Saidelles Bataglin & Daniela Dietz Viana & Carlos Torres Formoso, 2022. "Design Principles and Prescriptions for Planning and Controlling Engineer-to-Order Industrialized Building Systems," Sustainability, MDPI, vol. 14(24), pages 1-22, December.
    15. Wang, Wenshu & Xie, Kexin & Guo, Siqi & Li, Weixing & Xiao, Fan & Liang, Zhe, 2023. "A shift-based model to solve the integrated staff rostering and task assignment problem with real-world requirements," European Journal of Operational Research, Elsevier, vol. 310(1), pages 360-378.
    16. Alfnes, Erlend & Gosling, Jonathan & Naim, Mohamed & Dreyer, Heidi C., 2023. "Rearticulating supply chain design and operation principles to mitigate uncertainty in the Norwegian engineer-to-order shipbuilding sector," International Journal of Production Economics, Elsevier, vol. 262(C).
    17. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
    18. Jürgen Kuster & Dietmar Jannach & Gerhard Friedrich, 2010. "Applying Local Rescheduling in response to schedule disruptions," Annals of Operations Research, Springer, vol. 180(1), pages 265-282, November.
    19. Martens, Annelies & Vanhoucke, Mario, 2019. "The impact of applying effort to reduce activity variability on the project time and cost performance," European Journal of Operational Research, Elsevier, vol. 277(2), pages 442-453.
    20. Mile Katic & Renu Agarwal, 2018. "The Flexibility Paradox: Achieving Ambidexterity in High-Variety, Low-Volume Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(1), pages 69-86, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:founma:v:12:y:2020:i:1:p:71-84:n:6. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.