IDEAS home Printed from https://ideas.repec.org/a/spr/flsman/v34y2022i1d10.1007_s10696-021-09403-0.html
   My bibliography  Save this article

Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics

Author

Listed:
  • Zikai Zhang

    (Wuhan University of Science and Technology
    Wuhan University of Science and Technology)

  • Qiuhua Tang

    (Wuhan University of Science and Technology
    Wuhan University of Science and Technology)

Abstract

In this paper, flexible preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where m dedicated machines in the fabrication stage and one machine in the assembly stage. The operational status of each machine is described by a continuous variable, maintenance level. The maintenance level value is inversely proportional to the processing time. Once a PM activity is performed, this value will return to the initial value. Different from the PM at fixed predefined time intervals, flexible PM can be carried out at any time point, but the maintenance levels are not less than 0. Hence, a MILP model with maintenance level constraints is formulated to minimize the total completion time and maintenance time. Regarding the methods, a latest PM decision strategy is proposed to determine the execution time of PM activities. This new strategy is embedded into 15 constructive heuristics and 7 meta-heuristics (three variants of iterated local search, three variants of Q-learning-based ant colony system with local search and a Q-learning-based hyper-heuristics) to address this new problem. The final experimental analysis demonstrates the significance of the integrated model and the effectiveness of the proposed constructive heuristics and meta-heuristics.

Suggested Citation

  • Zikai Zhang & Qiuhua Tang, 2022. "Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics," Flexible Services and Manufacturing Journal, Springer, vol. 34(1), pages 156-203, March.
  • Handle: RePEc:spr:flsman:v:34:y:2022:i:1:d:10.1007_s10696-021-09403-0
    DOI: 10.1007/s10696-021-09403-0
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10696-021-09403-0
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10696-021-09403-0?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chung-Yee Lee & T. C. E. Cheng & B. M. T. Lin, 1993. "Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem," Management Science, INFORMS, vol. 39(5), pages 616-625, May.
    2. Zhou, Xiaojun & Lu, Zhiqiang & Xi, Lifeng, 2012. "Preventive maintenance optimization for a multi-component system under changing job shop schedule," Reliability Engineering and System Safety, Elsevier, vol. 101(C), pages 14-20.
    3. C. N. Potts & S. V. Sevast'janov & V. A. Strusevich & L. N. Van Wassenhove & C. M. Zwaneveld, 1995. "The Two-Stage Assembly Scheduling Problem: Complexity and Approximation," Operations Research, INFORMS, vol. 43(2), pages 346-355, April.
    4. Al-Anzi, Fawaz S. & Allahverdi, Ali, 2007. "A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times," European Journal of Operational Research, Elsevier, vol. 182(1), pages 80-94, October.
    5. Mosheiov, Gur & Sarig, Assaf & Strusevich, Vitaly A & Mosheiff, Jonathan, 2018. "Two-machine flow shop and open shop scheduling problems with a single maintenance window," European Journal of Operational Research, Elsevier, vol. 271(2), pages 388-400.
    6. G. M. Komaki & Shaya Sheikh & Behnam Malakooti, 2019. "Flow shop scheduling problems with assembly operations: a review and new trends," International Journal of Production Research, Taylor & Francis Journals, vol. 57(10), pages 2926-2955, May.
    7. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.
    8. Yokoyama, Masao & Santos, Daryl L., 2005. "Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times," European Journal of Operational Research, Elsevier, vol. 161(3), pages 754-770, March.
    9. Sung, C.S. & Kim, Hyun Ah, 2008. "A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1038-1048, June.
    10. Asiye Aydilek & Harun Aydilek & Ali Allahverdi, 2017. "Minimising maximum tardiness in assembly flowshops with setup times," International Journal of Production Research, Taylor & Francis Journals, vol. 55(24), pages 7541-7565, December.
    11. Tsui-Ping Chung & Feng Chen, 2019. "A complete immunoglobulin-based artificial immune system algorithm for two-stage assembly flowshop scheduling problem with part splitting and distinct due windows," International Journal of Production Research, Taylor & Francis Journals, vol. 57(10), pages 3219-3237, May.
    12. Yokoyama, Masao, 2001. "Hybrid flow-shop scheduling with assembly operations," International Journal of Production Economics, Elsevier, vol. 73(2), pages 103-116, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ming He & Qiuhua Tang & Jatinder N. D. Gupta & Di Yin & Zikai Zhang, 2023. "The shunting scheduling of EMU first-level maintenance in a stub-end depot," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 754-796, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.
    2. Niloy J. Mukherjee & Subhash C. Sarin & Daniel A. Neira, 2023. "Lot streaming for a two-stage assembly system in the presence of handling costs," Journal of Scheduling, Springer, vol. 26(4), pages 335-351, August.
    3. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
    4. Yokoyama, Masao, 2008. "Flow-shop scheduling with setup and assembly operations," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1184-1195, June.
    5. Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
    6. Sheikh, Shaya & Komaki, G.M. & Kayvanfar, Vahid & Teymourian, Ehsan, 2019. "Multi-Stage assembly flow shop with setup time and release time," Operations Research Perspectives, Elsevier, vol. 6(C).
    7. Hatami, Sara & Ruiz, Rubén & Andrés-Romano, Carlos, 2015. "Heuristics and metaheuristics for the distributed assembly permutation flowshop scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 169(C), pages 76-88.
    8. Xiong, Fuli & Xing, Keyi & Wang, Feng, 2015. "Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time," European Journal of Operational Research, Elsevier, vol. 240(2), pages 338-354.
    9. Ehsan Teymourian & Vahid Kayvanfar & GH. M. Komaki & Majtaba Khodarahmi, 2016. "An Enhanced Intelligent Water Drops Algorithm for Scheduling of an Agile Manufacturing System," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 15(02), pages 239-266, March.
    10. Yokoyama, Masao & Santos, Daryl L., 2005. "Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times," European Journal of Operational Research, Elsevier, vol. 161(3), pages 754-770, March.
    11. Zhang, Sicheng & Li, Xiang & Zhang, Bowen & Wang, Shouyang, 2020. "Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system," European Journal of Operational Research, Elsevier, vol. 283(2), pages 441-460.
    12. Hyun-Jung Kim & Jun-Ho Lee, 2021. "Cyclic robot scheduling for 3D printer-based flexible assembly systems," Annals of Operations Research, Springer, vol. 298(1), pages 339-359, March.
    13. Sung, C.S. & Kim, Hyun Ah, 2008. "A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1038-1048, June.
    14. Park, Moon-Won & Kim, Yeong-Dae, 2000. "A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints," European Journal of Operational Research, Elsevier, vol. 123(3), pages 504-518, June.
    15. George L. Vairaktarakis, 2003. "The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem," Management Science, INFORMS, vol. 49(6), pages 718-732, June.
    16. Weiya Zhong & Yun Shi, 2018. "Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility," Journal of Combinatorial Optimization, Springer, vol. 35(1), pages 108-125, January.
    17. Koulamas, Christos & Kyparisis, George J., 2007. "A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 945-951, October.
    18. Koulamas, Christos & Kyparisis, George J., 2004. "Concurrent flowshop scheduling to minimize makespan," European Journal of Operational Research, Elsevier, vol. 156(2), pages 524-529, July.
    19. Kovalyov, M. Y. & Potts, C. N. & Strusevich, V. A., 2004. "Batching decisions for assembly production systems," European Journal of Operational Research, Elsevier, vol. 157(3), pages 620-642, September.
    20. George J. Kyparisis & Christos Koulamas, 2002. "Assembly-Line Scheduling with Concurrent Operations and Parallel Machines," INFORMS Journal on Computing, INFORMS, vol. 14(1), pages 68-80, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:flsman:v:34:y:2022:i:1:d:10.1007_s10696-021-09403-0. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.