IDEAS home Printed from https://ideas.repec.org/a/inm/ortrsc/v29y1995i3p222-241.html
   My bibliography  Save this article

The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies

Author

Listed:
  • Juho Hahm

    (Department of Industrial Engineering, Seoul National University, Seoul, Korea)

  • Candace Arai Yano

    (Department of Industrial Engineering and Operations Research, University of California, Berkeley, California 94720)

Abstract

We investigate the problem of simultaneously scheduling the final production line of a captive supplier and the delivery of components produced on that line to an assembly facility that uses these components at a constant rate. The supplier incurs a sequence-independent setup cost and/or setup time each time the production line is changed over from one component to another. On the other hand, setup costs and times for the assembly facility are negligible. We consider two types of delivery costs: a fixed charge for each delivery, and a fixed-charge-per-truck cost. We develop a heuristic procedure to find a cyclic production and delivery schedule with the power-of-two property. That is, in each cycle, each component is produced 2 (mu) times for some small integer (mu), where the value of (mu) may differ across components. In addition, several equally-spaced deliveries occur in each cycle, where the number of deliveries is equal to the least common multiple of the component production frequencies. The objective is to find the schedule that minimizes the average cost per unit time of transportation, inventory at both the supplier and the assembly facility, and setup costs at the supplier. Computational results suggest that the heuristic performs well in an absolute sense, and that significant savings can be achieved by using coordinated production and delivery schedules rather than approaches in which they are decided sequentially. The results also indicate that in many situations, pure just-in-time policies (in which production and delivery frequencies are equal) are far from optimal. Our model provides a basis for determining the type and extent of improvements needed in the quest for just-in-time.

Suggested Citation

  • Juho Hahm & Candace Arai Yano, 1995. "The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies," Transportation Science, INFORMS, vol. 29(3), pages 222-241, August.
  • Handle: RePEc:inm:ortrsc:v:29:y:1995:i:3:p:222-241
    DOI: 10.1287/trsc.29.3.222
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/trsc.29.3.222
    Download Restriction: no

    File URL: https://libkey.io/10.1287/trsc.29.3.222?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
    2. Osman, Hany & Demirli, Kudret, 2012. "Economic lot and delivery scheduling problem for multi-stage supply chains," International Journal of Production Economics, Elsevier, vol. 136(2), pages 275-286.
    3. Sıla Çetinkaya & Chung‐Yee Lee, 2002. "Optimal outbound dispatch policies: Modeling inventory and cargo capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(6), pages 531-556, September.
    4. Clausen, Jens & Ju, Suquan, 2006. "A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1141-1150, December.
    5. Yu-Chung Tsao & Qinhong Zhang & Tsung-Hui Chen, 2016. "Multi-item distribution network design problems under volume discount on transportation cost," International Journal of Production Research, Taylor & Francis Journals, vol. 54(2), pages 426-443, January.
    6. Raa, Birger & Aghezzaf, El-Houssaine, 2008. "Designing distribution patterns for long-term inventory routing with constant demand rates," International Journal of Production Economics, Elsevier, vol. 112(1), pages 255-263, March.
    7. Guruprasad Pundoor & Zhi‐Long Chen, 2005. "Scheduling a production–distribution system to optimize the tradeoff between delivery tardiness and distribution cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 571-589, September.
    8. M Khouja, 2003. "Synchronization in supply chains: implications for design and management," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(9), pages 984-994, September.
    9. Pundoor, Guruprasad & Chen, Zhi-Long, 2009. "Joint cyclic production and delivery scheduling in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 55-74, May.
    10. Monalisha Pattnaik & Padmabati Gahan, 2021. "Preservation effort effects on retailers and manufacturers in integrated multi-deteriorating item discrete supply chain model," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 276-329, June.
    11. J-M Chen & T-H Chen, 2005. "Effects of joint replenishment and channel coordination for managing multiple deteriorating products in a supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(10), pages 1224-1234, October.
    12. Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    13. Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.
    14. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    15. Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
    16. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
    18. Baita, Flavio & Ukovich, Walter & Pesenti, Raffaele & Favaretto, Daniela, 1998. "Dynamic routing-and-inventory problems: a review," Transportation Research Part A: Policy and Practice, Elsevier, vol. 32(8), pages 585-598, November.
    19. Hrabec, Dušan & Hvattum, Lars Magnus & Hoff, Arild, 2022. "The value of integrated planning for production, inventory, and routing decisions: A systematic review and meta-analysis," International Journal of Production Economics, Elsevier, vol. 248(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ortrsc:v:29:y:1995:i:3:p:222-241. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.