IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v51y2005i4p614-628.html
   My bibliography  Save this article

Integrated Scheduling of Production and Distribution Operations

Author

Listed:
  • Zhi-Long Chen

    (Department of Decision and Information Technologies, Robert H. Smith School of Business, University of Maryland, College Park, Maryland 20742-1815)

  • George L. Vairaktarakis

    (Department of Operations, Weatherhead School of Management, Case Western Reserve University, Cleveland, Ohio 44106-7235)

Abstract

Motivated by applications in the computer and food catering service industries, we study an integrated scheduling model of production and distribution operations. In this model, a set of jobs (i.e., customer orders) are first processed in a processing facility (e.g., manufacturing plant or service center) and then delivered to the customers directly without intermediate inventory. The problem is to find a joint schedule of production and distribution such that an objective function that takes into account both customer service level and total distribution cost is optimized. Customer service level is measured by a function of the times when the jobs are delivered to the customers. The distribution cost of a delivery shipment consists of a fixed charge and a variable cost proportional to the total distance of the route taken by the shipment. We study two classes of problems under this integrated scheduling model. In the first class of problems, customer service is measured by the average time when the jobs are delivered to the customers; in the second class, customer service is measured by the maximum time when the jobs are delivered to the customers. Two machine configurations in the processing facility---single machine and parallel machine---are considered. For each of the problems studied, we provide an efficient exact algorithm, or a proof of intractability accompanied by a heuristic algorithm with worst-case and asymptotic performance analysis. Computational experiments demonstrate that the heuristics developed are capable of generating near-optimal solutions. We also investigate the possible benefit of using the proposed integrated model relative to a sequential model where production and distribution operations are scheduled sequentially and separately. Computational tests show that in many cases a significant benefit can be achieved by integration.

Suggested Citation

  • Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
  • Handle: RePEc:inm:ormnsc:v:51:y:2005:i:4:p:614-628
    DOI: 10.1287/mnsc.1040.0325
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.1040.0325
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.1040.0325?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Herrmann, Jeffrey W. & Lee, Chung-Yee, 1993. "On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date," European Journal of Operational Research, Elsevier, vol. 70(3), pages 272-288, November.
    2. Juho Hahm & Candace Arai Yano, 1995. "The Economic Lot and Delivery Scheduling Problem: Powers of Two Policies," Transportation Science, INFORMS, vol. 29(3), pages 222-241, August.
    3. Nicholas G. Hall & 'Maseka Lesaoana & Chris N. Potts, 2001. "Scheduling with Fixed Delivery Dates," Operations Research, INFORMS, vol. 49(1), pages 134-144, February.
    4. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
    5. C. N. Potts, 1980. "Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times," Operations Research, INFORMS, vol. 28(6), pages 1436-1441, December.
    6. F. Fumero & C. Vercellis, 1999. "Synchronized Development of Production, Inventory, and Distribution Schedules," Transportation Science, INFORMS, vol. 33(3), pages 330-340, August.
    7. Chen, Zhi-Long, 1996. "Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs," European Journal of Operational Research, Elsevier, vol. 93(1), pages 49-60, August.
    8. Morris A. Cohen & Hau L. Lee, 1988. "Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods," Operations Research, INFORMS, vol. 36(2), pages 216-228, April.
    9. Li, Chung-Lun & Vairaktarakis, George & Lee, Chung-Yee, 2005. "Machine scheduling with deliveries to multiple customer locations," European Journal of Operational Research, Elsevier, vol. 164(1), pages 39-51, July.
    10. Cheng, T. C. Edwin & Gordon, Valery S. & Kovalyov, Mikhail Y., 1996. "Single machine scheduling with batch deliveries," European Journal of Operational Research, Elsevier, vol. 94(2), pages 277-283, October.
    11. Leslie A. Hall & David B. Shmoys, 1992. "Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better," Mathematics of Operations Research, INFORMS, vol. 17(1), pages 22-35, February.
    12. Chandra, Pankaj & Fisher, Marshall L., 1994. "Coordination of production and distribution planning," European Journal of Operational Research, Elsevier, vol. 72(3), pages 503-517, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Guruprasad Pundoor & Zhi‐Long Chen, 2005. "Scheduling a production–distribution system to optimize the tradeoff between delivery tardiness and distribution cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 571-589, September.
    2. Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
    3. Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
    4. Kathryn E. Stecke & Xuying Zhao, 2007. "Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 206-224, September.
    5. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    6. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    7. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
    8. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
    9. Chen, Bo & Lee, Chung-Yee, 2008. "Logistics scheduling with batching and transportation," European Journal of Operational Research, Elsevier, vol. 189(3), pages 871-876, September.
    10. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
    11. Ali Gharaei & Fariborz Jolai, 2021. "A Pareto approach for the multi-factory supply chain scheduling and distribution problem," Operational Research, Springer, vol. 21(4), pages 2333-2364, December.
    12. Maliheh Ganji & Rahmat Rabet & Seyed Mojtaba Sajadi, 2022. "A new coordinating model for green supply chain and batch delivery scheduling with satisfaction customers," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 24(4), pages 4566-4601, April.
    13. Jin, Mingzhou & Luo, Yi & Eksioglu, Sandra D., 2008. "Integration of production sequencing and outbound logistics in the automotive industry," International Journal of Production Economics, Elsevier, vol. 113(2), pages 766-774, June.
    14. Lixin Tang & Feng Li & Jiyin Liu, 2015. "Integrated scheduling of loading and transportation with tractors and semitrailers separated," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(5), pages 416-433, August.
    15. Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
    16. Lei Lei & Hua Zhong & W. Art Chaovalitwongse, 2009. "On the Integrated Production and Distribution Problem with Bidirectional Flows," INFORMS Journal on Computing, INFORMS, vol. 21(4), pages 585-598, November.
    17. Schmid, Verena & Doerner, Karl F. & Laporte, Gilbert, 2013. "Rich routing problems arising in supply chain management," European Journal of Operational Research, Elsevier, vol. 224(3), pages 435-448.
    18. Yunqiang Yin & Doudou Li & Dujuan Wang & T. C. E. Cheng, 2021. "Single-machine serial-batch delivery scheduling with two competing agents and due date assignment," Annals of Operations Research, Springer, vol. 298(1), pages 497-523, March.
    19. Hrabec, Dušan & Hvattum, Lars Magnus & Hoff, Arild, 2022. "The value of integrated planning for production, inventory, and routing decisions: A systematic review and meta-analysis," International Journal of Production Economics, Elsevier, vol. 248(C).
    20. Wang, Guoqing & Cheng, T. C. Edwin, 2000. "Parallel machine scheduling with batch delivery costs," International Journal of Production Economics, Elsevier, vol. 68(2), pages 177-183, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:51:y:2005:i:4:p:614-628. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.