IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v52y2004i2p229-242.html
   My bibliography  Save this article

Scheduling Problems with Two Competing Agents

Author

Listed:
  • Allesandro Agnetis

    (Dipartimento di Ingegneria dell'Informazione, Universitaà di Siena, via Roma 56, 53100 Siena, Italy)

  • Pitu B. Mirchandani

    (Department of Systems and Industrial Engineering, The University of Arizona, Tucson, Arizona 85721)

  • Dario Pacciarelli

    (Dipartimento di Informatica e Automazione, Università Roma Tre, Rome, Italy)

  • Andrea Pacifici

    (Dipartimento di Informatica, Sistemi e Produzione and Centro Vito Volterra, Università di Roma “Tor Vergata,” Rome, Italy)

Abstract

We consider the scheduling problems arising when two agents, each with a set of nonpreemptive jobs, compete to perform their respective jobs on a common processing resource. Each agent wants to minimize a certain objective function, which depends on the completion times of its jobs only. The objective functions we consider in this paper are maximum of regular functions (associated with each job), number of late jobs, and total weighted completion times. We obtain different scenarios, depending on the objective function of each agent, and on the structure of the processing system (single machine or shop). For each scenario, we address the complexity of various problems, namely, finding the optimal solution for one agent with a constraint on the other agent's cost function, finding single nondominated schedules (i.e., such that a better schedule for one of the two agents necessarily results in a worse schedule for the other agent), and generating all nondominated schedules.

Suggested Citation

  • Allesandro Agnetis & Pitu B. Mirchandani & Dario Pacciarelli & Andrea Pacifici, 2004. "Scheduling Problems with Two Competing Agents," Operations Research, INFORMS, vol. 52(2), pages 229-242, April.
  • Handle: RePEc:inm:oropre:v:52:y:2004:i:2:p:229-242
    DOI: 10.1287/opre.1030.0092
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.1030.0092
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.1030.0092?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Nagar, Amit & Haddock, Jorge & Heragu, Sunderesh, 1995. "Multiple and bicriteria scheduling: A literature survey," European Journal of Operational Research, Elsevier, vol. 81(1), pages 88-104, February.
    2. Brewer, Paul J. & Plott, Charles R., 1996. "A binary conflict ascending price (BICAP) mechanism for the decentralized allocation of the right to use railroad tracks," International Journal of Industrial Organization, Elsevier, vol. 14(6), pages 857-886, October.
    3. Hamers, H.J.M. & Borm, P.E.M. & Tijs, S.H., 1993. "On games corresponding to sequencing situations with ready times," Other publications TiSEM 8e2af556-5430-4f98-9334-c, Tilburg University, School of Economics and Management.
    4. Hamers, Herbert & Suijs, Jeroen & Tijs, Stef & Borm, Peter, 1996. "The Split Core for Sequencing Games," Games and Economic Behavior, Elsevier, vol. 15(2), pages 165-176, August.
    5. Hervé Crès & Hervé Moulin, 2001. "Scheduling with Opting Out: Improving upon Random Priority," Operations Research, INFORMS, vol. 49(4), pages 565-577, August.
    6. E. L. Lawler, 1973. "Optimal Sequencing of a Single Machine Subject to Precedence Constraints," Management Science, INFORMS, vol. 19(5), pages 544-546, January.
    7. Hoogeveen, J. A. & van de Velde, S. L., 2001. "Scheduling with target start times," European Journal of Operational Research, Elsevier, vol. 129(1), pages 87-94, February.
    8. Chen, Chuen-Lung & Bulfin, Robert L., 1993. "Complexity of single machine, multi-criteria scheduling problems," European Journal of Operational Research, Elsevier, vol. 70(1), pages 115-125, October.
    9. Wellman, Michael P. & Walsh, William E. & Wurman, Peter R. & MacKie-Mason, Jeffrey K., 2001. "Auction Protocols for Decentralized Scheduling," Games and Economic Behavior, Elsevier, vol. 35(1-2), pages 271-303, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mosheiov, Gur, 2005. "Minimizing total completion time and total deviation of job completion times from a restrictive due-date," European Journal of Operational Research, Elsevier, vol. 165(1), pages 20-33, August.
    2. van Velzen, S. & Hamers, H.J.M., 2002. "On the Balancedness of Relaxed Sequencing Games," Discussion Paper 2002-49, Tilburg University, Center for Economic Research.
    3. van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021. "Cooperation and Competition in Linear Production and Sequencing Processes," Discussion Paper 2021-011, Tilburg University, Center for Economic Research.
    4. Gallien, Jérémie. & Wein, Lawrence M., 2003. "Design and analysis of a smart market for industrial procurement," Working papers WP 4137-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    5. Gupta, Jatinder N. D. & Ruiz-Torres, Alex J., 2000. "Minimizing makespan subject to minimum total flow-time on identical parallel machines," European Journal of Operational Research, Elsevier, vol. 125(2), pages 370-380, September.
    6. Min Ji & Sai Liu & Xiaolin Zhang & Keke Cao & T. C. E. Cheng, 2017. "Sequencing Games with Slack Due Windows and Group Technology Considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(2), pages 121-133, February.
    7. Alessandro Agnetis & Dario Pacciarelli & Andrea Pacifici, 2007. "Multi-agent single machine scheduling," Annals of Operations Research, Springer, vol. 150(1), pages 3-15, March.
    8. Erenay, Fatih Safa & Sabuncuoglu, Ihsan & Toptal, Aysegül & Tiwari, Manoj Kumar, 2010. "New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 201(1), pages 89-98, February.
    9. Peter Borm & Herbert Hamers & Ruud Hendrickx, 2001. "Operations research games: A survey," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 9(2), pages 139-199, December.
    10. Wan, Guohua & Yen, Benjamin P.-C., 2009. "Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 195(1), pages 89-97, May.
    11. Herbert Hamers & Flip Klijn & Bas Velzen, 2005. "On the Convexity of Precedence Sequencing Games," Annals of Operations Research, Springer, vol. 137(1), pages 161-175, July.
    12. Herbert Hamers & Flip Klijn & Bas van Velzen, 2002. "On Games corresponding to Sequencing Situations with Precedence Relations," UFAE and IAE Working Papers 553.02, Unitat de Fonaments de l'Anàlisi Econòmica (UAB) and Institut d'Anàlisi Econòmica (CSIC).
    13. Haral, Uday & Chen, Rew-Win & Ferrell, William Jr & Kurz, Mary Beth, 2007. "Multiobjective single machine scheduling with nontraditional requirements," International Journal of Production Economics, Elsevier, vol. 106(2), pages 574-584, April.
    14. van Velzen, S. & Hamers, H.J.M., 2002. "On the Balancedness of Relaxed Sequencing Games," Other publications TiSEM 14e21ac6-26af-438e-943b-9, Tilburg University, School of Economics and Management.
    15. Suijs, J.P.M., 1998. "Cooperative decision making in a stochastic environment," Other publications TiSEM a84d779a-d5a9-48e9-bfe7-4, Tilburg University, School of Economics and Management.
    16. Koksalan, Murat & Burak Keha, Ahmet, 2003. "Using genetic algorithms for single-machine bicriteria scheduling problems," European Journal of Operational Research, Elsevier, vol. 145(3), pages 543-556, March.
    17. Cheng, T.C.E. & Ng, C.T. & Yuan, J.J., 2008. "Multi-agent scheduling on a single machine with max-form criteria," European Journal of Operational Research, Elsevier, vol. 188(2), pages 603-609, July.
    18. Imma Curiel, 2010. "Multi-stage sequencing situations," International Journal of Game Theory, Springer;Game Theory Society, vol. 39(1), pages 151-162, March.
    19. Schouten, Jop & Saavedra-Nieves, Alejandro & Fiestras-Janeiro, G., 2020. "Sequencing Situations and Games with Non-Linear Cost Functions," Other publications TiSEM 3e1db5c9-0f77-4f91-a075-c, Tilburg University, School of Economics and Management.
    20. Tolga Aydinliyim & George L. Vairaktarakis, 2010. "Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(2), pages 236-255, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:52:y:2004:i:2:p:229-242. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.