IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v77y2002i2p131-143.html
   My bibliography  Save this article

Determining manufacturing batch sizes for a lumpy delivery system with trend demand

Author

Listed:
  • Diponegoro, Ahmad
  • Sarker, Bhaba R.

Abstract

No abstract is available for this item.

Suggested Citation

  • Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
  • Handle: RePEc:eee:proeco:v:77:y:2002:i:2:p:131-143
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(02)00108-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jamal, A. M. M. & Sarker, Bhaba R., 1993. "An optimal batch size for a production system operating under a just-in-time delivery system," International Journal of Production Economics, Elsevier, vol. 32(2), pages 255-260, September.
    2. Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
    3. אסתר טולידנו, 1998. "מקבלי דמי אבטלה, 1997," Working Papers 415, National Insurance Institute of Israel.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Csenki, Attila, 2009. "Stochastic demand patterns for Markov service facilities with neutral and active periods," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 382-393.
    2. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
    3. Rahman, Mohammad Anwar Ashek & Sarker, Bhaba R., 2007. "Supply chain models for an assembly system with preprocessing of raw materials," European Journal of Operational Research, Elsevier, vol. 181(2), pages 733-752, September.
    4. A Diponegoro & B R Sarker, 2007. "Operations policy for a supply chain system with fixed-interval delivery and linear demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 901-910, July.
    5. Hoque, M. A. & Goyal, S. K., 2005. "On lot streaming in multistage production systems," International Journal of Production Economics, Elsevier, vol. 95(2), pages 195-202, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    2. Sarker, Bhaba R. & Balan, Chidambaram V., 1999. "Operations planning for a multi-stage kanban system," European Journal of Operational Research, Elsevier, vol. 112(2), pages 284-303, January.
    3. Jaber, Mohamad Y. & Bonney, Maurice, 2001. "Economic lot sizing with learning and continuous time discounting: Is it significant?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 135-143, May.
    4. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
    5. Avkiran, Necmi K., 2001. "Investigating technical and scale efficiencies of Australian Universities through data envelopment analysis," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 57-80, March.
    6. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    7. Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
    8. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
    9. Rho, Boo-Ho & Park, Kwangtae & Yu, Yung-Mok, 2001. "An international comparison of the effect of manufacturing strategy-implementation gap on business performance," International Journal of Production Economics, Elsevier, vol. 70(1), pages 89-97, March.
    10. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    11. Rahman, Mohammad Anwar Ashek & Sarker, Bhaba R., 2007. "Supply chain models for an assembly system with preprocessing of raw materials," European Journal of Operational Research, Elsevier, vol. 181(2), pages 733-752, September.
    12. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    13. Sarker, Bhaba R., 2014. "Consignment stocking policy models for supply chain systems: A critical review and comparative perspectives," International Journal of Production Economics, Elsevier, vol. 155(C), pages 52-67.
    14. Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.
    15. Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
    16. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    17. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
    18. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
    19. Alexander Cotte, Poveda, 2011. "Economic development and growth in Colombia: An empirical analysis with super-efficiency DEA and panel data models," Socio-Economic Planning Sciences, Elsevier, vol. 45(4), pages 154-164, December.
    20. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:77:y:2002:i:2:p:131-143. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.