IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v208y2019icp53-68.html
   My bibliography  Save this article

Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance

Author

Listed:
  • Sharafali, Moosa
  • Tarakci, Hakan
  • Kulkarni, Shailesh
  • Razack Shahul Hameed, Raja Abdul

Abstract

In this paper, we analyse the due-date-to-promise problem for a supplier who supplies parts to his customer. The parts are produced on an unreliable machine with constant production rate. The machine is leased from a contractor who is also entrusted with its maintenance. The supplier's decision is the optimal due date to promise to his customer, taking into account the holding and tardiness costs on the customer side, as well as the transfer payment to the contractor for the lease and maintenance of the equipment. The contractor in turn has to decide on the frequency of pre-ventive maintenance. Both maximize their own profits. For this finite horizon optimization problem, we employ a Non-Renewal-Theory based approach from the literature to derive the performance characteristics in the transient regime - first for a general setting involving general distributions and then, for a special case. We then use Game Theory to analyse the underlying two-member game for both the non-cooperative and cooperative cases. A numerical example drawn from the literature is used to illustrate the special case. We show that for the special case, the game has a unique Nash equilibrium. Another significant result is that the Nash solution dominates the Stackelberg solution when the supplier is the leader. The supplier is worse off when the contractor is the leader. The example further shows that the supplier and the contractor stand to gain under cooperation which is well documented in the literature. We point to relevant literature for strategies to enforce this cooperation.

Suggested Citation

  • Sharafali, Moosa & Tarakci, Hakan & Kulkarni, Shailesh & Razack Shahul Hameed, Raja Abdul, 2019. "Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance," International Journal of Production Economics, Elsevier, vol. 208(C), pages 53-68.
  • Handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:53-68
    DOI: 10.1016/j.ijpe.2018.11.019
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318304584
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.11.019?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Eti, M.C. & Ogaji, S.O.T. & Probert, S.D., 2006. "Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture," Applied Energy, Elsevier, vol. 83(11), pages 1235-1248, November.
    2. Andy Alexander & Yanjun Li & Robert Plante, 2017. "Sustaining system coordination in outsourcing the maintenance function of a process having a linear failure rate," IISE Transactions, Taylor & Francis Journals, vol. 49(5), pages 544-552, May.
    3. John R. Grout & David P. Christy, 1993. "An inventory model of incentives for on‐time delivery in just‐in‐time purchasing contracts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(6), pages 863-877, October.
    4. Kut C. So, 2000. "Price and Time Competition for Service Delivery," Manufacturing & Service Operations Management, INFORMS, vol. 2(4), pages 392-409, April.
    5. Hamidi, Maryam & Liao, Haitao & Szidarovszky, Ferenc, 2016. "Non-cooperative and cooperative game-theoretic models for usage-based lease contracts," European Journal of Operational Research, Elsevier, vol. 255(1), pages 163-174.
    6. Tarakci, Hakan & Tang, Kwei & Teyarachakul, Sunantha, 2009. "Learning effects on maintenance outsourcing," European Journal of Operational Research, Elsevier, vol. 192(1), pages 138-150, January.
    7. Alaswad, Suzan & Xiang, Yisha, 2017. "A review on condition-based maintenance optimization models for stochastically deteriorating system," Reliability Engineering and System Safety, Elsevier, vol. 157(C), pages 54-63.
    8. Pongpech, J. & Murthy, D.N.P., 2006. "Optimal periodic preventive maintenance policy for leased equipment," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 772-777.
    9. Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
    10. Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
    11. Grout, John R., 1997. "A model of incentive contracts for just-in-time delivery," European Journal of Operational Research, Elsevier, vol. 96(1), pages 139-147, January.
    12. Ray, Saibal & Jewkes, E. M., 2004. "Customer lead time management when both demand and price are lead time sensitive," European Journal of Operational Research, Elsevier, vol. 153(3), pages 769-781, March.
    13. Richard Barlow & Larry Hunter, 1960. "Optimum Preventive Maintenance Policies," Operations Research, INFORMS, vol. 8(1), pages 90-100, February.
    14. Tamer Boyaci & Saibal Ray, 2003. "Product Differentiation and Capacity Cost Interaction in Time and Price Sensitive Markets," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 18-36, May.
    15. Murthy, D. N. P. & Asgharizadeh, E., 1999. "Optimal decision making in a maintenance service operation," European Journal of Operational Research, Elsevier, vol. 116(2), pages 259-273, July.
    16. Teck H. Ho & Yu-Sheng Zheng, 2004. "Setting Customer Expectation in Service Delivery: An Integrated Marketing-Operations Perspective," Management Science, INFORMS, vol. 50(4), pages 479-488, April.
    17. Rodrigo Pascual & Gabriel Santelices & Haitao Liao & Sergio Maturana, 2016. "Channel coordination on fixed-term maintenance outsourcing contracts," IISE Transactions, Taylor & Francis Journals, vol. 48(7), pages 651-660, July.
    18. J. Ansell & A. Bendell & S. Humble, 1984. "Age Replacement Under Alternative Cost Criteria," Management Science, INFORMS, vol. 30(3), pages 358-367, March.
    19. Erica L. Plambeck & Stefanos A. Zenios, 2000. "Performance-Based Incentives in a Dynamic Principal-Agent Model," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 240-263, April.
    20. So, Kut C. & Song, Jing-Sheng, 1998. "Price, delivery time guarantees and capacity selection," European Journal of Operational Research, Elsevier, vol. 111(1), pages 28-49, November.
    21. A. Ben Mabrouk & A. Chelbi & M. Radhoui, 2016. "Optimal imperfect preventive maintenance policy for equipment leased during successive periods," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5095-5110, September.
    22. Huang, Yonghui & Guo, Xianping, 2011. "Finite horizon semi-Markov decision processes with application to maintenance systems," European Journal of Operational Research, Elsevier, vol. 212(1), pages 131-140, July.
    23. Olde Keizer, Minou C.A. & Flapper, Simme Douwe P. & Teunter, Ruud H., 2017. "Condition-based maintenance policies for systems with multiple dependent components: A review," European Journal of Operational Research, Elsevier, vol. 261(2), pages 405-420.
    24. Ekin, Tahir, 2018. "Integrated maintenance and production planning with endogenous uncertain yield," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 52-61.
    25. Y. S. Sherif & M. L. Smith, 1981. "Optimal maintenance models for systems subject to failure–A Review," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 28(1), pages 47-74, March.
    26. Urban, Timothy L., 2009. "Establishing delivery guarantee policies," European Journal of Operational Research, Elsevier, vol. 196(3), pages 959-967, August.
    27. Jaturonnatee, J. & Murthy, D.N.P. & Boondiskulchok, R., 2006. "Optimal preventive maintenance of leased equipment with corrective minimal repairs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 201-215, October.
    28. Hora, Michael E., 1987. "The unglamorous game of managing maintenance," Business Horizons, Elsevier, vol. 30(3), pages 67-75.
    29. Toshio Nakagawa, 2005. "Maintenance Theory of Reliability," Springer Series in Reliability Engineering, Springer, number 978-1-84628-221-8, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tao, Liangyan & Liu, Sifeng & Xie, Naiming & Javed, Saad Ahmed, 2021. "Optimal position of supply chain delivery window with risk-averse suppliers: A CVaR optimization approach," International Journal of Production Economics, Elsevier, vol. 232(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hashemi, M. & Asadi, M. & Zarezadeh, S., 2020. "Optimal maintenance policies for coherent systems with multi-type components," Reliability Engineering and System Safety, Elsevier, vol. 195(C).
    2. Urban, Timothy L., 2009. "Establishing delivery guarantee policies," European Journal of Operational Research, Elsevier, vol. 196(3), pages 959-967, August.
    3. Jackson, Canek & Pascual, Rodrigo & Mac Cawley, Alejandro & Godoy, Sergio, 2023. "Product–service system negotiation in aircraft lease contracts with option of disagreement," Journal of Air Transport Management, Elsevier, vol. 107(C).
    4. Hammami, Ramzi & Frein, Yannick & Nouira, Imen & Albana, Abduh-Sayid, 2022. "On the interplay between local lead times, overall lead time, prices, and profits in decentralized supply chains," International Journal of Production Economics, Elsevier, vol. 243(C).
    5. Badía, F.G. & Berrade, M.D. & Cha, Ji Hwan & Lee, Hyunju, 2018. "Optimal replacement policy under a general failure and repair model: Minimal versus worse than old repair," Reliability Engineering and System Safety, Elsevier, vol. 180(C), pages 362-372.
    6. Weixin Shang & Liming Liu, 2011. "Promised Delivery Time and Capacity Games in Time-Based Competition," Management Science, INFORMS, vol. 57(3), pages 599-610, March.
    7. Jalili Marand, Ata & Li, Hongyan & Thorstenson, Anders, 2019. "Joint inventory control and pricing in a service-inventory system," International Journal of Production Economics, Elsevier, vol. 209(C), pages 78-91.
    8. Qian, Li, 2014. "Market-based supplier selection with price, delivery time, and service level dependent demand," International Journal of Production Economics, Elsevier, vol. 147(PC), pages 697-706.
    9. Ülkü, M. Ali & Bookbinder, James H., 2012. "Optimal quoting of delivery time by a third party logistics provider: The impact of shipment consolidation and temporal pricing schemes," European Journal of Operational Research, Elsevier, vol. 221(1), pages 110-117.
    10. Zhao, Jing & Zhang, Qin, 2021. "The effect of contract methods on the lead time of a two-level photovoltaic supply chain: revenue-sharing vs. cost-sharing," Energy, Elsevier, vol. 231(C).
    11. Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
    12. Xia, Tangbin & Dong, Yifan & Xiao, Lei & Du, Shichang & Pan, Ershun & Xi, Lifeng, 2018. "Recent advances in prognostics and health management for advanced manufacturing paradigms," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 255-268.
    13. Yang, Yang & Liu, Jie & Hu, Taizhong, 2023. "Capital allocation and pricing decisions under trade credit with time-sensitive stochastic demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 173(C).
    14. Finkelstein, Maxim & Cha, Ji Hwan & Langston, Amy, 2023. "Improving classical optimal age-replacement policies for degrading items," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
    15. Zhai, Yue & Hua, Guowei & Cheng, Meng & Cheng, T.C.E., 2023. "Production lead-time hedging and order allocation in an MTO supply chain," European Journal of Operational Research, Elsevier, vol. 311(3), pages 887-905.
    16. Jayaswal, Sachin & Jewkes, Elizabeth & Ray, Saibal, 2011. "Product differentiation and operations strategy in a capacitated environment," European Journal of Operational Research, Elsevier, vol. 210(3), pages 716-728, May.
    17. Jayaswal, Sachin, 2014. "Priority Service System Optimization under Service Level Constraints," IIMA Working Papers WP2014-08-04, Indian Institute of Management Ahmedabad, Research and Publication Department.
    18. Abduh Sayid Albana & Yannick Frein & Ramzi Hammami, 2016. "Study of Client Reject Policies under Lead-Time and Price Dependent Demand," Working Papers hal-01250835, HAL.
    19. Finkelstein, Maxim & Cha, Ji Hwan & Bedford, Tim, 2023. "Optimal preventive maintenance strategy for populations of systems that generate outputs," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
    20. Yi Ding & Anatoly Lisnianski & Ilia Frenkel & Lev Khvatskin, 2009. "Optimal corrective maintenance contract planning for aging multi‐state system," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 25(5), pages 612-631, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:208:y:2019:i:c:p:53-68. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.