IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v158y2014icp44-53.html
   My bibliography  Save this article

Integrated spare parts logistics and operations planning for maintenance service providers

Author

Listed:
  • Kazemi Zanjani, Masoumeh
  • Nourelfath, Mustapha

Abstract

This paper considers the problem of coordinated spare-part logistics and operations planning for third-party maintenance providers. Due to the multi-indenture structure of the equipment, different types of components might randomly fail to perform at different points of time. The spare part logistics literature has been focused on spare part inventory management in an in-house maintenance context. In this article, a mathematical programming model is first developed to formulate the problem in the context of a third-party maintenance provider who is faced with strict due dates for the delivery of repaired equipment. The model seeks the optimal number of maintenance jobs that can be completed to deliver at each period, as well as the order quantity of spare parts so as to minimize the procurement, inventory, and equipment late delivery costs, while taking into account the spare part supply lead-time. Next, we model the spare part demand uncertainty as a non-stationary stochastic process in each period in the planning horizon. The deterministic model is then reformulated as a multi-stage stochastic program with recourse. We also discuss the complexity of the stochastic model and propose a preprocessing approach to reduce its size for large instances. Numerical results demonstrate how the proposed model links the spare part logistics and equipment delivery decisions under spare part demand uncertainty.

Suggested Citation

  • Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2014. "Integrated spare parts logistics and operations planning for maintenance service providers," International Journal of Production Economics, Elsevier, vol. 158(C), pages 44-53.
  • Handle: RePEc:eee:proeco:v:158:y:2014:i:c:p:44-53
    DOI: 10.1016/j.ijpe.2014.07.012
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527314002291
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2014.07.012?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Sang-Hyun Kim & Morris A. Cohen & Serguei Netessine, 2007. "Performance Contracting in After-Sales Service Supply Chains," Management Science, INFORMS, vol. 53(12), pages 1843-1858, December.
    2. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    3. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
    4. Kutanoglu, Erhan & Lohiya, Divi, 2008. "Integrated inventory and transportation mode selection: A service parts logistics system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 44(5), pages 665-683, September.
    5. T Jin & P Wang, 2012. "Planning performance based contracts considering reliability and uncertain system usage," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 63(10), pages 1467-1478, October.
    6. Craig C. Sherbrooke, 1968. "Metric: A Multi-Echelon Technique for Recoverable Item Control," Operations Research, INFORMS, vol. 16(1), pages 122-141, February.
    7. Tarim, S. Armagan & Kingsman, Brian G., 2004. "The stochastic dynamic production/inventory lot-sizing problem with service-level constraints," International Journal of Production Economics, Elsevier, vol. 88(1), pages 105-119, March.
    8. Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D., 2002. "An overview of recent literature on spare parts inventories," International Journal of Production Economics, Elsevier, vol. 76(2), pages 201-215, March.
    9. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    10. Chelbi, Anis & Ait-Kadi, Daoud, 2001. "Spare provisioning strategy for preventively replaced systems subjected to random failure," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 183-189, December.
    11. Craig C. Sherbrooke, 1986. "VARI-METRIC : Improved Approximations for Multi-Indenture, Multi-Echelon Availability Models," Operations Research, INFORMS, vol. 34(2), pages 311-319, April.
    12. Z Hua & J Yang & F Huang & X Xu, 2009. "A static-dynamic strategy for spare part inventory systems with nonstationary stochastic demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1254-1263, September.
    13. Vaughan, Timothy S., 2005. "Failure replacement and preventive maintenance spare parts ordering policy," European Journal of Operational Research, Elsevier, vol. 161(1), pages 183-190, February.
    14. Holger Heitsch & Werner Römisch, 2009. "Scenario tree reduction for multistage stochastic programs," Computational Management Science, Springer, vol. 6(2), pages 117-133, May.
    15. John R. Birge, 1985. "Decomposition and Partitioning Methods for Multistage Stochastic Linear Programs," Operations Research, INFORMS, vol. 33(5), pages 989-1007, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Christopher A. Boone & Benjamin T. Hazen & Joseph B. Skipper & Robert E. Overstreet, 2018. "A framework for investigating optimization of service parts performance with big data," Annals of Operations Research, Springer, vol. 270(1), pages 65-74, November.
    3. Kafiabad, Shayan Tavakoli & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2020. "Integrated planning of operations and on-job training in maintenance logistics networks," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    4. Ramez Kian & Tolga Bektaş & Djamila Ouelhadj, 2019. "Optimal spare parts management for vessel maintenance scheduling," Annals of Operations Research, Springer, vol. 272(1), pages 323-353, January.
    5. Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
    6. Chekurov, Sergei & Metsä-Kortelainen, Sini & Salmi, Mika & Roda, Irene & Jussila, Ari, 2018. "The perceived value of additively manufactured digital spare parts in industry: An empirical investigation," International Journal of Production Economics, Elsevier, vol. 205(C), pages 87-97.
    7. Moura, Márcio das Chagas & Santana, João Mateus & Droguett, Enrique López & Lins, Isis Didier & Guedes, Bruno Nunes, 2017. "Analysis of extended warranties for medical equipment: A Stackelberg game model using priority queues," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 338-354.
    8. Hu, Shaolong & Han, Chuanfeng & Dong, Zhijie Sasha & Meng, Lingpeng, 2019. "A multi-stage stochastic programming model for relief distribution considering the state of road network," Transportation Research Part B: Methodological, Elsevier, vol. 123(C), pages 64-87.
    9. Tavakoli Kafiabad, Shayan & Zanjani, Masoumeh Kazemi & Nourelfath, Mustapha, 2022. "Robust collaborative maintenance logistics network design and planning," International Journal of Production Economics, Elsevier, vol. 244(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jin, Tongdan & Tian, Zhigang & Xie, Min, 2015. "A game-theoretical approach for optimizing maintenance, spares and service capacity in performance contracting," International Journal of Production Economics, Elsevier, vol. 161(C), pages 31-43.
    2. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    3. Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
    4. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    5. Xie, Wei & Liao, Haitao & Jin, Tongdan, 2014. "Maximizing system availability through joint decision on component redundancy and spares inventory," European Journal of Operational Research, Elsevier, vol. 237(1), pages 164-176.
    6. Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
    7. Mirzahosseinian, H. & Piplani, R., 2011. "A study of repairable parts inventory system operating under performance-based contract," European Journal of Operational Research, Elsevier, vol. 214(2), pages 256-261, October.
    8. Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
    9. Patra, Pradipta & Kumar, U. Dinesh & Nowicki, David R. & Randall, Wesley S., 2019. "Effective management of performance-based contracts for sustainment dominant systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 369-382.
    10. Xian Zhao & Jing Zhang & Xiaoyue Wang, 2019. "Joint optimization of components redundancy, spares inventory and repairmen allocation for a standby series system," Journal of Risk and Reliability, , vol. 233(4), pages 623-638, August.
    11. Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
    12. Araceli Zavala & David Nowicki & Jose Emmanuel Ramirez-Marquez, 2019. "Quantitative metrics to analyze supply chain resilience and associated costs," Journal of Risk and Reliability, , vol. 233(2), pages 186-199, April.
    13. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    14. Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
    15. Ghaddar, Bissan & Sakr, Nizar & Asiedu, Yaw, 2016. "Spare parts stocking analysis using genetic programming," European Journal of Operational Research, Elsevier, vol. 252(1), pages 136-144.
    16. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
    17. Korkeamäki, Lauri & Kohtamäki, Marko & Parida, Vinit, 2021. "Worth the risk? The profit impact of outcome-based service offerings for manufacturing firms," Journal of Business Research, Elsevier, vol. 131(C), pages 92-102.
    18. D Nowicki & U D Kumar & H J Steudel & D Verma, 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(3), pages 342-352, March.
    19. Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
    20. Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:158:y:2014:i:c:p:44-53. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.