IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v129y2011i1p43-50.html
   My bibliography  Save this article

Outsourcing and production scheduling for a two-stage flow shop

Author

Listed:
  • Qi, Xiangtong

Abstract

In this paper we study the production scheduling problem for a two-stage flow shop in which there are options of outsourcing some operations to subcontractors. The basic objective is to look for a production schedule that can optimally utilize the resources of both the in-house production and outsourcing so that the makespan is minimized. The logistics issue between the subcontractor and the in-house shop further complicates the problem. We present models for different situations of outsourcing. For each model, we develop optimization algorithms and conduct computational experiments to study the managerial insights for the models and the algorithms.

Suggested Citation

  • Qi, Xiangtong, 2011. "Outsourcing and production scheduling for a two-stage flow shop," International Journal of Production Economics, Elsevier, vol. 129(1), pages 43-50, January.
  • Handle: RePEc:eee:proeco:v:129:y:2011:i:1:p:43-50
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00317-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
    2. Wang, Xiuli & Cheng, T.C.E., 2009. "Logistics scheduling to minimize inventory and transport costs," International Journal of Production Economics, Elsevier, vol. 121(1), pages 266-273, September.
    3. Lee, Ik Sun & Sung, C.S., 2008. "Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed," European Journal of Operational Research, Elsevier, vol. 186(3), pages 931-952, May.
    4. Tolga Aydinliyim & George L. Vairaktarakis, 2010. "Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs," Manufacturing & Service Operations Management, INFORMS, vol. 12(2), pages 236-255, January.
    5. Chang, Yung-Chia & Lee, Chung-Yee, 2004. "Machine scheduling with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 158(2), pages 470-487, October.
    6. Kyparisis, George J. & Koulamas, Christos, 2006. "A note on makespan minimization in two-stage flexible flow shops with uniform machines," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1321-1327, December.
    7. Nicholas Hall & Chris Potts, 2005. "The Coordination of Scheduling and Batch Deliveries," Annals of Operations Research, Springer, vol. 135(1), pages 41-64, March.
    8. T.C. Cheng & Mikhail Kovalyov, 2001. "Single Supplier Scheduling for Multiple Deliveries," Annals of Operations Research, Springer, vol. 107(1), pages 51-63, October.
    9. Nicholas G. Hall & Chris N. Potts, 2003. "Supply chain scheduling: Batching and delivery," Operations Research, INFORMS, vol. 51(4), pages 566-584, August.
    10. Lee, Ik Sun & Sung, C.S., 2008. "Single machine scheduling with outsourcing allowed," International Journal of Production Economics, Elsevier, vol. 111(2), pages 623-634, February.
    11. Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
    12. Alper Atamtürk & Dorit S. Hochbaum, 2001. "Capacity Acquisition, Subcontracting, and Lot Sizing," Management Science, INFORMS, vol. 47(8), pages 1081-1100, August.
    13. Li, Chung-Lun & Vairaktarakis, George & Lee, Chung-Yee, 2005. "Machine scheduling with deliveries to multiple customer locations," European Journal of Operational Research, Elsevier, vol. 164(1), pages 39-51, July.
    14. Jian Yang & Xiangtong Qi & Yusen Xia, 2005. "A Production-Inventory System with Markovian Capacity and Outsourcing Option," Operations Research, INFORMS, vol. 53(2), pages 328-349, April.
    15. Chung, Daeyoung & Lee, Kichang & Shin, Kitae & Park, Jinwoo, 2005. "A new approach to job shop scheduling problems with due date constraints considering operation subcontracts," International Journal of Production Economics, Elsevier, vol. 98(2), pages 238-250, November.
    16. Peter Brucker & Sigrid Knust & T.C. Cheng & Natalia Shakhlevich, 2004. "Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays," Annals of Operations Research, Springer, vol. 129(1), pages 81-106, July.
    17. James R. Bradley, 2004. "A Brownian Approximation of a Production-Inventory System with a Manufacturer That Subcontracts," Operations Research, INFORMS, vol. 52(5), pages 765-784, October.
    18. Jan A. Van Mieghem, 1999. "Coordinating Investment, Production, and Subcontracting," Management Science, INFORMS, vol. 45(7), pages 954-971, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Choi, Byung-Cheon & Chung, Kwanghun, 2016. "Min–max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty," European Journal of Operational Research, Elsevier, vol. 252(2), pages 367-375.
    2. Feng, Bo & Fan, Zhi-Ping & Li, Yanzhi, 2011. "A decision method for supplier selection in multi-service outsourcing," International Journal of Production Economics, Elsevier, vol. 132(2), pages 240-250, August.
    3. Li, Gang & Wang, Xiao-Yuan & Wang, Ji-Bo & Sun, Lin-Yan, 2013. "Worst case analysis of flow shop scheduling problems with a time-dependent learning effect," International Journal of Production Economics, Elsevier, vol. 142(1), pages 98-104.
    4. Choi, Byung-Cheon & Chung, Jibok, 2011. "Two-machine flow shop scheduling problem with an outsourcing option," European Journal of Operational Research, Elsevier, vol. 213(1), pages 66-72, August.
    5. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    6. Zhen, Lu, 2014. "A three-stage optimization model for production and outsourcing under China’s export-oriented tax policies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 69(C), pages 1-20.
    7. Jianfeng Ren & Guo Sun & Yuzhong Zhang, 2017. "The Supplying Chain Scheduling with Outsourcing and Transportation," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-13, April.
    8. Yeung, Wing-Kwan & Choi, Tsan-Ming & Cheng, T.C.E., 2011. "Supply chain scheduling and coordination with dual delivery modes and inventory storage cost," International Journal of Production Economics, Elsevier, vol. 132(2), pages 223-229, August.
    9. Zhong, Xueling & Ou, Jinwen & Wang, Guoqing, 2014. "Order acceptance and scheduling with machine availability constraints," European Journal of Operational Research, Elsevier, vol. 232(3), pages 435-441.
    10. Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
    11. Chung, Dae-Young & Choi, Byung-Cheon, 2013. "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 226(1), pages 46-52.
    12. Lingfa Lu & Liqi Zhang & Jinwen Ou, 2021. "In-house production and outsourcing under different discount schemes on the total outsourcing cost," Annals of Operations Research, Springer, vol. 298(1), pages 361-374, March.
    13. Mohammed Haoues & Mohammed Dahane & Nadia Kenza Mouss, 2019. "Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 701-725, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
    2. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    3. Lee, Kangbok & Choi, Byung-Cheon, 2011. "Two-stage production scheduling with an outsourcing option," European Journal of Operational Research, Elsevier, vol. 213(3), pages 489-497, September.
    4. Gao, Su & Qi, Lian & Lei, Lei, 2015. "Integrated batch production and distribution scheduling with limited vehicle capacity," International Journal of Production Economics, Elsevier, vol. 160(C), pages 13-25.
    5. Lixin Tang & Feng Li & Jiyin Liu, 2015. "Integrated scheduling of loading and transportation with tractors and semitrailers separated," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(5), pages 416-433, August.
    6. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    7. Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
    8. Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
    9. Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
    10. Averbakh, Igor, 2010. "On-line integrated production-distribution scheduling problems with capacitated deliveries," European Journal of Operational Research, Elsevier, vol. 200(2), pages 377-384, January.
    11. Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
    12. Wang, Xiuli & Cheng, T.C.E., 2009. "Logistics scheduling to minimize inventory and transport costs," International Journal of Production Economics, Elsevier, vol. 121(1), pages 266-273, September.
    13. Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
    14. Hua Gong & Lixin Tang & Joseph Y.T. Leung, 2016. "Parallel machine scheduling with batch deliveries to minimize total flow time and delivery cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(6), pages 492-502, September.
    15. Jianfeng Ren & Guo Sun & Yuzhong Zhang, 2017. "The Supplying Chain Scheduling with Outsourcing and Transportation," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(02), pages 1-13, April.
    16. Sun Lee, Ik & Yoon, S.H., 2010. "Coordinated scheduling of production and delivery stages with stage-dependent inventory holding costs," Omega, Elsevier, vol. 38(6), pages 509-521, December.
    17. Zhong, Weiya & Dosa, Gyorgy & Tan, Zhiyi, 2007. "On the machine scheduling problem with job delivery coordination," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1057-1072, November.
    18. B.‐Y. Cheng & J.Y.‐T. Leung & K. Li & S.‐L. Yang, 2015. "Single batch machine scheduling with deliveries," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(6), pages 470-482, September.
    19. Feng Li & Zhou Xu & Zhi-Long Chen, 2020. "Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs," INFORMS Journal on Computing, INFORMS, vol. 32(4), pages 1012-1029, October.
    20. Wang, Xiuli & Cheng, T.C.E., 2009. "Production scheduling with supply and delivery considerations to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 194(3), pages 743-752, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:129:y:2011:i:1:p:43-50. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.