IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v86y1995i1p43-56.html
   My bibliography  Save this article

Hierarchical production planning in a make-to-order company: A case study

Author

Listed:
  • Carravilla, Maria Antonia
  • de Sousa, Jorge Pinho

Abstract

No abstract is available for this item.

Suggested Citation

  • Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
  • Handle: RePEc:eee:ejores:v:86:y:1995:i:1:p:43-56
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(95)00060-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gelders, Ludo F. & Van Wassenhove, Luk N., 1981. "Production planning: a review," European Journal of Operational Research, Elsevier, vol. 7(2), pages 101-110, June.
    2. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J., 2001. "A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 5-20, December.
    2. Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
    3. Ozdamar, Linet & Bozyel, M. Ali & Birbil, S. Ilker, 1998. "A hierarchical decision support system for production planning (with case study)," European Journal of Operational Research, Elsevier, vol. 104(3), pages 403-422, February.
    4. Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
    5. Sawik, Tadeusz, 2007. "A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1060-1075, August.
    6. S Eom & E Kim, 2006. "A survey of decision support system applications (1995–2001)," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(11), pages 1264-1278, November.
    7. Schneewei[beta], Christoph, 1995. "Hierarchical structures in organisations: A conceptual framework," European Journal of Operational Research, Elsevier, vol. 86(1), pages 4-31, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
    2. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    3. Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
    4. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    5. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    6. Dellaert, N. P. & Melo, M. T., 1996. "Stochastic lot-sizing: Solution and heuristic methods," International Journal of Production Economics, Elsevier, vol. 46(1), pages 261-276, December.
    7. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    8. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    9. Weng, Z. Kevin, 1996. "Manufacturing lead times, system utilization rates and lead-time-related demand," European Journal of Operational Research, Elsevier, vol. 89(2), pages 259-268, March.
    10. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
    11. Ian R. Webb & Bruce R. Buzby & Gerard M. Campbell, 1997. "Cyclical schedules for the joint replenishment problem with dynamic demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 577-589, September.
    12. Dellaert, N. P. & Melo, M. T., 1998. "Make-to-order policies for a stochastic lot-sizing problem using overtime," International Journal of Production Economics, Elsevier, vol. 56(1), pages 79-97, September.
    13. Calosso, T. & Cantamessa, M. & Vu, Dang & Villa, A., 2003. "Production planning and order acceptance in business to business electronic commerce," International Journal of Production Economics, Elsevier, vol. 85(2), pages 233-249, August.
    14. repec:dgr:rugsom:95a42 is not listed on IDEAS
    15. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    16. Briskorn, Dirk & Zeise, Philipp & Packowski, Josef, 2016. "Quasi-fixed cyclic production schemes for multiple products with stochastic demand," European Journal of Operational Research, Elsevier, vol. 252(1), pages 156-169.
    17. Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
    18. Sitoh, P. J. & Braiden, P. M. & Simmons, J. E. L., 1998. "The development of a method for determining the efficiency and effectiveness of installed CAPM systems," International Journal of Production Economics, Elsevier, vol. 56(1), pages 587-599, September.
    19. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    20. Ebadian, M. & Rabbani, M. & Jolai, F. & Torabi, S.A. & Tavakkoli-Moghaddam, R., 2008. "A new decision-making structure for the order entry stage in make-to-order environments," International Journal of Production Economics, Elsevier, vol. 111(2), pages 351-367, February.
    21. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:86:y:1995:i:1:p:43-56. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.