IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v189y2008i1p41-58.html
   My bibliography  Save this article

An inventory control system for products with optional components under service level and budget constraints

Author

Listed:
  • Wang, Tai-Yue
  • Hu, Jui-Ming

Abstract

Modularization and customization have made enterprises face the multi-item inventory problems and the interactions among those items. A powerful, affordable information technology system can make the continuous review inventory policy more convenient, efficient, and effective. In this study, a (Q, r) model is developed to find the optimal lot size and reorder point for a multi-item inventory with interactions between necessary and optional components. In order to accurately approximate costs, the service cost is introduced and defined in proportion to the service level. In addition, the service cost and purchasing cost are taken simultaneously, and are treated as a budget constraint for executives to consider because the firm's strategy could influence the choice of service level. The proposed model is formulated as a nonlinear optimization problem, as the service level is nonlinear. Thus, some known procedures are revised to solve this problem and the results are compared with other models. The results show that the revised procedure performs better than the N-R procedure, leading to important insights about inventory control policy.

Suggested Citation

  • Wang, Tai-Yue & Hu, Jui-Ming, 2008. "An inventory control system for products with optional components under service level and budget constraints," European Journal of Operational Research, Elsevier, vol. 189(1), pages 41-58, August.
  • Handle: RePEc:eee:ejores:v:189:y:2008:i:1:p:41-58
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00507-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ghalebsaz-Jeddi, Babak & Shultes, Bruce C. & Haji, Rasoul, 2004. "A multi-product continuous review inventory system with stochastic demand, backorders, and a budget constraint," European Journal of Operational Research, Elsevier, vol. 158(2), pages 456-469, October.
    2. Lawrence L. Parker, 1964. "Economical reorder quantities and reorder points with uncertain demand," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 11(3‐4), pages 351-358, September.
    3. Ulrich W. Thonemann & Margaret L. Brandeau, 2000. "Optimal Commonality in Component Design," Operations Research, INFORMS, vol. 48(1), pages 1-19, February.
    4. David A. Collier, 1982. "Aggregate Safety Stock Levels and Component Part Commonality," Management Science, INFORMS, vol. 28(11), pages 1296-1303, November.
    5. Anantaram Balakrishnan & Michael S. Pangburn & Euthemia Stavrulaki, 2004. ""Stack Them High, Let 'em Fly": Lot-Sizing Policies When Inventories Stimulate Demand," Management Science, INFORMS, vol. 50(5), pages 630-644, May.
    6. Bhattacharya, D. K., 2005. "On multi-item inventory," European Journal of Operational Research, Elsevier, vol. 162(3), pages 786-791, May.
    7. Lawrence Dale Thomas, 1991. "Commonality Analysis Using Clustering Methods," Operations Research, INFORMS, vol. 39(4), pages 677-680, August.
    8. Chen, Youhua Frank, 2005. "Fractional programming approach to two stochastic inventory problems," European Journal of Operational Research, Elsevier, vol. 160(1), pages 63-71, January.
    9. Ernst, Ricardo & Kamrad, Bardia, 2000. "Evaluation of supply chain structures through modularization and postponement," European Journal of Operational Research, Elsevier, vol. 124(3), pages 495-510, August.
    10. Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
    11. Jayashankar M. Swaminathan & Sridhar R. Tayur, 1998. "Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes," Management Science, INFORMS, vol. 44(12-Part-2), pages 161-172, December.
    12. Urgeletti Tinarelli, Giulia, 1983. "Inventory control: Models and problems," European Journal of Operational Research, Elsevier, vol. 14(1), pages 1-12, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lee, Chang-Yong & Lee, Dongju, 2018. "An efficient method for solving a correlated multi-item inventory system," Operations Research Perspectives, Elsevier, vol. 5(C), pages 13-21.
    2. Ishfaq, Rafay & Bajwa, Naeem, 2019. "Profitability of online order fulfillment in multi-channel retailing," European Journal of Operational Research, Elsevier, vol. 272(3), pages 1028-1040.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jing-Sheng Song & Yao Zhao, 2009. "The Value of Component Commonality in a Dynamic Inventory System with Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 11(3), pages 493-508, March.
    2. Jan A. Van Mieghem, 2004. "Note--Commonality Strategies: Value Drivers and Equivalence with Flexible Capacity and Inventory Substitution," Management Science, INFORMS, vol. 50(3), pages 419-424, March.
    3. Eva Labro, 2004. "The Cost Effects of Component Commonality: A Literature Review Through a Management-Accounting Lens," Manufacturing & Service Operations Management, INFORMS, vol. 6(4), pages 358-367, June.
    4. Ulrich W. Thonemann & Margaret L. Brandeau, 2000. "Optimal Commonality in Component Design," Operations Research, INFORMS, vol. 48(1), pages 1-19, February.
    5. Menezes, Mozart B.C. & Ruiz-Hernández, Diego & Guimaraes, Renato, 2016. "The component commonality problem in a real multidimensional space: An algorithmic approach," European Journal of Operational Research, Elsevier, vol. 249(1), pages 105-116.
    6. Lee, Chang-Yong & Lee, Dongju, 2018. "An efficient method for solving a correlated multi-item inventory system," Operations Research Perspectives, Elsevier, vol. 5(C), pages 13-21.
    7. Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
    8. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    9. Hsieh, Ying-Jiun, 2011. "Demand switching criteria for multiple products: An inventory cost analysis," Omega, Elsevier, vol. 39(2), pages 130-137, April.
    10. Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    11. Brun, Alessandro & Capra, Eugenio & Miragliotta, Giovanni, 2009. "VRP revisited: The impact of behavioural costs in balancing standardisation and variety," International Journal of Production Economics, Elsevier, vol. 117(1), pages 16-29, January.
    12. Thyssen, Jesper & Israelsen, Poul & Jørgensen, Brian, 2005. "Activity Based Costing as a method for assessing the economics of modularization - a case study and beyond," Management Accounting Research Group Working Papers M-2005-04, University of Aarhus, Aarhus School of Business, Department of Business Studies.
    13. Kuthambalayan, Thyagaraj S. & Mehta, Peeyush & Shanker, Kripa, 2014. "Integrating operations and marketing decisions using delayed differentiation of products and guaranteed delivery time under stochastic demand," European Journal of Operational Research, Elsevier, vol. 237(2), pages 617-627.
    14. Ghalebsaz-Jeddi, Babak & Shultes, Bruce C. & Haji, Rasoul, 2004. "A multi-product continuous review inventory system with stochastic demand, backorders, and a budget constraint," European Journal of Operational Research, Elsevier, vol. 158(2), pages 456-469, October.
    15. Susan H. Xu & Zhaolin Li, 2007. "Managing a Single-Product Assemble-to-Order System with Technology Innovations," Management Science, INFORMS, vol. 53(9), pages 1467-1485, September.
    16. Graman, Gregory A., 2010. "A partial-postponement decision cost model," European Journal of Operational Research, Elsevier, vol. 201(1), pages 34-44, February.
    17. Tibben-Lembke, Ronald S. & Bassok, Yehuda, 2005. "An inventory model for delayed customization: A hybrid approach," European Journal of Operational Research, Elsevier, vol. 165(3), pages 748-764, September.
    18. Jans, Raf & Degraeve, Zeger & Schepens, Luc, 2008. "Analysis of an industrial component commonality problem," European Journal of Operational Research, Elsevier, vol. 186(2), pages 801-811, April.
    19. Tang, Dong, 2011. "Managing finished-goods inventory under capacitated delayed differentiation," Omega, Elsevier, vol. 39(5), pages 481-492, October.
    20. Weskamp, Christoph & Koberstein, Achim & Schwartz, Frank & Suhl, Leena & Voß, Stefan, 2019. "A two-stage stochastic programming approach for identifying optimal postponement strategies in supply chains with uncertain demand," Omega, Elsevier, vol. 83(C), pages 123-138.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:189:y:2008:i:1:p:41-58. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.