IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v168y2006i3p732-746.html
   My bibliography  Save this article

A special case of transfer lines balancing by graph approach

Author

Listed:
  • Dolgui, Alexandre
  • Guschinsky, Nikolai
  • Levin, Genrikh

Abstract

No abstract is available for this item.

Suggested Citation

  • Dolgui, Alexandre & Guschinsky, Nikolai & Levin, Genrikh, 2006. "A special case of transfer lines balancing by graph approach," European Journal of Operational Research, Elsevier, vol. 168(3), pages 732-746, February.
  • Handle: RePEc:eee:ejores:v:168:y:2006:i:3:p:732-746
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(04)00482-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Allan L. Gutjahr & George L. Nemhauser, 1964. "An Algorithm for the Line Balancing Problem," Management Science, INFORMS, vol. 11(2), pages 308-315, November.
    2. Scholl, Armin, 1995. "Balancing and sequencing of assembly lines," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 9690, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Giuseppe Fragapane & Dmitry Ivanov & Mirco Peron & Fabio Sgarbossa & Jan Ola Strandhagen, 2022. "Increasing flexibility and productivity in Industry 4.0 production networks with autonomous mobile robots and smart intralogistics," Annals of Operations Research, Springer, vol. 308(1), pages 125-143, January.
    2. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2007. "A classification of assembly line balancing problems," European Journal of Operational Research, Elsevier, vol. 183(2), pages 674-693, December.
    3. Delorme, Xavier & Dolgui, Alexandre & Kovalyov, Mikhail Y., 2012. "Combinatorial design of a minimum cost transfer line," Omega, Elsevier, vol. 40(1), pages 31-41, January.
    4. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2008. "Assembly line balancing: Which model to use when," International Journal of Production Economics, Elsevier, vol. 111(2), pages 509-528, February.
    5. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    6. Otto, Alena & Li, Xiyu, 2020. "Product sequencing in multiple-piece-flow assembly lines," Omega, Elsevier, vol. 91(C).
    7. Dolgui, A. & Guschinsky, N. & Levin, G. & Proth, J.-M., 2008. "Optimisation of multi-position machines and transfer lines," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1375-1389, March.
    8. Araújo, Felipe F.B. & Costa, Alysson M. & Miralles, Cristóbal, 2012. "Two extensions for the ALWABP: Parallel stations and collaborative approach," International Journal of Production Economics, Elsevier, vol. 140(1), pages 483-495.
    9. Dolgui, A. & Ihnatsenka, I., 2009. "Branch and bound algorithm for a transfer line design problem: Stations with sequentially activated multi-spindle heads," European Journal of Operational Research, Elsevier, vol. 197(3), pages 1119-1132, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    2. Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
    3. Bautista, Joaquín & Pereira, Jordi, 2011. "Procedures for the Time and Space constrained Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 212(3), pages 473-481, August.
    4. Hager Triki & Ahmed Mellouli & Faouzi Masmoudi, 2017. "A multi-objective genetic algorithm for assembly line resource assignment and balancing problem of type 2 (ALRABP-2)," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 371-385, February.
    5. M. H. Alavidoost & M. H. Fazel Zarandi & Mosahar Tarimoradi & Yaser Nemati, 2017. "Modified genetic algorithm for simple straight and U-shaped assembly line balancing with fuzzy processing times," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 313-336, February.
    6. Hop, Nguyen Van, 2006. "A heuristic solution for fuzzy mixed-model line balancing problem," European Journal of Operational Research, Elsevier, vol. 168(3), pages 798-810, February.
    7. Lai, Tsung-Chyan & Sotskov, Yuri N. & Dolgui, Alexandre & Zatsiupa, Aksana, 2016. "Stability radii of optimal assembly line balances with a fixed workstation set," International Journal of Production Economics, Elsevier, vol. 182(C), pages 356-371.
    8. Amen, Matthias, 2006. "Cost-oriented assembly line balancing: Model formulations, solution difficulty, upper and lower bounds," European Journal of Operational Research, Elsevier, vol. 168(3), pages 747-770, February.
    9. Kimms, Alf, 1998. "Minimal investment budgets for flow line configuration," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 470, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    10. Emel Kızılkaya Aydoğan & Yılmaz Delice & Uğur Özcan & Cevriye Gencer & Özkan Bali, 2019. "Balancing stochastic U-lines using particle swarm optimization," Journal of Intelligent Manufacturing, Springer, vol. 30(1), pages 97-111, January.
    11. Bautista, Joaquín & Pereira, Jordi, 2009. "A dynamic programming based heuristic for the assembly line balancing problem," European Journal of Operational Research, Elsevier, vol. 194(3), pages 787-794, May.
    12. Lai, Tsung-Chyan & Sotskov, Yuri N. & Dolgui, Alexandre, 2019. "The stability radius of an optimal line balance with maximum efficiency for a simple assembly line," European Journal of Operational Research, Elsevier, vol. 274(2), pages 466-481.
    13. Lapierre, Sophie D. & Ruiz, Angel & Soriano, Patrick, 2006. "Balancing assembly lines with tabu search," European Journal of Operational Research, Elsevier, vol. 168(3), pages 826-837, February.
    14. Dolgui, A. & Guschinsky, N. & Levin, G. & Proth, J.-M., 2008. "Optimisation of multi-position machines and transfer lines," European Journal of Operational Research, Elsevier, vol. 185(3), pages 1375-1389, March.
    15. Becker, Christian & Scholl, Armin, 2006. "A survey on problems and methods in generalized assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 694-715, February.
    16. Lambert, Alfred J.D., 2006. "Generation of assembly graphs by systematic analysis of assembly structures," European Journal of Operational Research, Elsevier, vol. 168(3), pages 932-951, February.
    17. Pape, Tom, 2015. "Heuristics and lower bounds for the simple assembly line balancing problem type 1: Overview, computational tests and improvements," European Journal of Operational Research, Elsevier, vol. 240(1), pages 32-42.
    18. Walter, Rico & Schulze, Philipp & Scholl, Armin, 2021. "SALSA: Combining branch-and-bound with dynamic programming to smoothen workloads in simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 295(3), pages 857-873.
    19. Moreira, Mayron César O. & Costa, Alysson M., 2013. "Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers," International Journal of Production Economics, Elsevier, vol. 141(2), pages 552-560.
    20. Chica, Manuel & Bautista, Joaquín & Cordón, Óscar & Damas, Sergio, 2016. "A multiobjective model and evolutionary algorithms for robust time and space assembly line balancing under uncertain demand," Omega, Elsevier, vol. 58(C), pages 55-68.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:168:y:2006:i:3:p:732-746. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.