Author
Listed:
- Komlavi Ii Adjegan
- Flore Gubert
(DIAL - Développement, institutions et analyses de long terme, LEDa - Laboratoire d'Economie de Dauphine - IRD - Institut de Recherche pour le Développement - Université Paris Dauphine-PSL - PSL - Université Paris Sciences et Lettres - CNRS - Centre National de la Recherche Scientifique)
- B. Marion
- François Roubaud
(DIAL - Développement, institutions et analyses de long terme, DALEMBERT - Institut Jean Le Rond d'Alembert - SU - Sorbonne Université - CNRS - Centre National de la Recherche Scientifique, LEDa - Laboratoire d'Economie de Dauphine - IRD - Institut de Recherche pour le Développement - Université Paris Dauphine-PSL - PSL - Université Paris Sciences et Lettres - CNRS - Centre National de la Recherche Scientifique)
- Camille Saint Macary
- Virginie Comblon
Abstract
In the Democratic Republic of Congo (DRC), only a third of the population has basic access to drinking water. The lack of access to drinking water is particularly marked in urban areas, especially in the capital city of Kinshasa and its outlying districts. This results in poor hygiene and sanitation conditions and in large amounts of time spent every day for collecting water. To improve this situation, AFD initiated the PILAEP "Promotion de modalités Innovantes pour L'Accès à I'Eau Potable" (2008-2012) and PILAEP2 (2017-2021) projects, which involve setting up autonomous drinking water distribution networks for people living in the outlying districts of Kinshasa and Bas Congo who are not served by the national water distribution company (REGIDESO). Each network is managed by a Users' Association (ASUREP) and comprises a borehole, a reservoir, a distribution network and a system of standpipes, capable of supplying 1,000 inhabitants with drinking water. This report presents the impact assessment of the PILAEP2 project. The first section describes the evaluation protocol and the survey methods used to measure the project's impact. The second section presents descriptive analyses of the study districts, their demographic dynamics and changes in water supply and demand over the study period. The third section presents the results of the evaluation of the impact of the PILAEP 2 project on the populations targeted by the project, focusing on five groups of indicators: water supply, physical and mental health, education, employment and governance.
Suggested Citation
Komlavi Ii Adjegan & Flore Gubert & B. Marion & François Roubaud & Camille Saint Macary & Virginie Comblon, 2026.
"Évaluation de l’impact du projet PILAEP 2 dans les quartiers périphériques de Kinshasa (RDC),"
Working Papers
hal-05492956, HAL.
Handle:
RePEc:hal:wpaper:hal-05492956
Note: View the original document on HAL open archive server: https://hal.science/hal-05492956v1
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:wpaper:hal-05492956. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.