Risk-Oriented Methodology for Contractor Management in the Construction of Optical Lines, Including Modeling of Crew Productivity and Logistics Delays in PERT/CPM Networks and Calibration of Contractual Incentives/Penalties

Author

Listed:
  • Mykola Gomzov

    (Contractor at Spectrum, Fiber-Optic Deployment for Spectrum Customers, St Petersburg, FL, USA)

Abstract

Against the backdrop of the rapid expansion of the fiber-optic communication line (FOCL) market driven by the rollout of 5G networks and the scaling of FTTH access, construction projects operate under heightened uncertainty in which up to 80% of total costs are formed by labor expenditures. This work addresses the identified research gap, namely the absence of a formalized linkage between quantitative project risk assessment and the tuning of contractual parameters. The objective of the study is to develop and theoretically substantiate a risk-oriented methodology for managing contractor organizations that integrates stochastic optimization of the schedule with a procedure for calibrating incentives and sanctions in the contract. The methodological basis synthesizes tools of network planning (PERT/CPM), probabilistic modeling (Monte Carlo method), and the provisions of contract theory. The key result is an algorithm that translates variability in crew performance and logistics delays into a probabilistic distribution of project completion times (S-curve). Using this distribution, an approach is proposed for objectively setting target deadlines, as well as for economically sound calculation of bonuses for early completion and liquidated damages for schedule violations. The findings demonstrate that the proposed scheme enables a shift from a deterministic to a probabilistic management paradigm, increases implementation predictability, and aligns the economic incentives of the client and the contractor. The material is intended for project managers, engineers, and contract specialists in the telecommunications sector.

Suggested Citation

  • Mykola Gomzov, 2025. "Risk-Oriented Methodology for Contractor Management in the Construction of Optical Lines, Including Modeling of Crew Productivity and Logistics Delays in PERT/CPM Networks and Calibration of Contractual Incentives/Penalties," Post-Print hal-05712178, HAL.
  • Handle: RePEc:hal:journl:hal-05712178
    DOI: 10.59324/ejiss.2025.1(6).09
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a
    for a similarly titled item that would be available.

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-05712178. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.