Abstract
Construction is defined as a major industry that exploits natural resources globally. A construction delay can be defined as an extended construction duration, beyond the expected completion time. Various literatures proved that delays are a major and most common risk faced by the construction industry throughout the year. Hence, the objectives of this study are to identify the major causes of construction delays in Saudi Arabian projects, to determine the effects of construction delays in Saudi Arabia and to propose workable preventive solutions to eliminate or minimize the project delays. A questionnaire analysis was conducted to identify the causes and effects of delays in KSA's construction industry. From the analysis, a lack of manpower skill (mean score 4.51 out of 5), manpower shortage (mean score 4.33 out of 5), delays in material delivery (mean score 4.13 out of 5), material shortage (mean score 4.13 out of 5) and poor project planning and coordination was identified as top 5 most occurring causes of delays, which resulted from contractor related causes of delays. Fifteen effects of construction delays were identified from the literature and distributed to respondents in questionnaire. From the research analysis, deterioration of company image (mean score 4.27 out of 5), bankruptcy (mean score 4.16 out of 5), stress for contractors (mean score 3.56 out of 5), total abandonment (mean score 3.53 out of 5) and acceleration of losses (mean score 3.02 out of 5) ranked as top 5 effects of construction delays.
Suggested Citation
Ahmed K. S Alshakhrit & Eris Elianddy Supeni & Nur Ismarrubbie Zahari, 2019.
"Causes And Effects Of Delays In Saudi Arabian Construction Projects,"
Post-Print
hal-05305967, HAL.
Handle:
RePEc:hal:journl:hal-05305967
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-05305967. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.