Author
Listed:
- Laurène Surbier
(G-SCOP_CC - Conception collaborative - G-SCOP - Laboratoire des sciences pour la conception, l'optimisation et la production - UJF - Université Joseph Fourier - Grenoble 1 - Grenoble INP - Institut polytechnique de Grenoble - Grenoble Institute of Technology - INPG - Institut National Polytechnique de Grenoble - CNRS - Centre National de la Recherche Scientifique)
- Gülgün Alpan
(G-SCOP_GCSP - Gestion et Conduite des Systèmes de Production - G-SCOP - Laboratoire des sciences pour la conception, l'optimisation et la production - UJF - Université Joseph Fourier - Grenoble 1 - Grenoble INP - Institut polytechnique de Grenoble - Grenoble Institute of Technology - INPG - Institut National Polytechnique de Grenoble - CNRS - Centre National de la Recherche Scientifique)
- Eric Blanco
(G-SCOP_CC - Conception collaborative - G-SCOP - Laboratoire des sciences pour la conception, l'optimisation et la production - UJF - Université Joseph Fourier - Grenoble 1 - Grenoble INP - Institut polytechnique de Grenoble - Grenoble Institute of Technology - INPG - Institut National Polytechnique de Grenoble - CNRS - Centre National de la Recherche Scientifique)
Abstract
Production ramp-up is becoming increasingly important for industries. The urge for innovation pushes firms to constantly launch new products on their market. Therefore New Product Development and its final phase, the production ramp-up, can no longer be considered as rare events. In this paper, our research aims at gaining knowledge about the production ramp-up through the analysis of major problems encountered during this production phase. Based on an industrial case of a product transfer project, we studied the ramp-up phase, gathering a list of problem statements. These problem statements are then organized in classes, giving characteristic problem types. A further study of these problem types gives the opportunity to have a better understanding of current ramp-up phases but also helps better organizing future ones in up-coming New Product Development projects.
Suggested Citation
Laurène Surbier & Gülgün Alpan & Eric Blanco, 2009.
"Identification of problem types during production ramp-up,"
Post-Print
hal-00391357, HAL.
Handle:
RePEc:hal:journl:hal-00391357
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-00391357. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.