Abstract
The objective of this preliminary study was to investigate the effect of delayed compaction and/or stockpiling of cold central plant recycled materials with foamed asphalt recycling agents and cement active fillers. The results are also considered applicable for emulsified asphalt recycling agents and in-place cold recycling. Given that hydrated lime is currently not permitted as an active filler for cold recycled materials in Caltrans specifications, no tests were conducted with lime, and no recommendations are made regarding stockpile time if lime is considered in the future. A separate study will need to be completed for lime if justified. The following conclusions were drawn from the test results: (1) delayed compaction or stockpiling results in reduced material workability—characterized by lower densities, strengths, and stiffnesses—which in turn will result in shorter pavement life, (2) delayed compaction or stockpiling can further increase variability in terms of density, strength, and stiffness of cold recycled materials, given that the material could be at various levels of curing/cementation throughout the stockpile window, and (3) the densities obtained using Marshall compaction do not represent the densities achieved in the field, which can result in overestimation of the strength for quality control. The following recommendations are made based on the results of this preliminary study: (1) the current specification requirement that layers of cold recycled material be placed and compacted within two hours of mixing time (i.e., from when mixing moisture is added to the cement) should be maintained and if delayed compaction or material stockpiling is permitted for any reason, quality control testing should be performed on specimens compacted to the breakover density achieved at the sampling location in the area of compaction delay, (2) on cold recycling projects where the processed material is discharged from the lane-width track-driven recycler in a windrow, consideration should be given to limiting the distance between the recycler and paver to ensure that the two-hour limit for completion of compaction is met, (3) on cold recycling projects where wheel-driven recyclers (i.e., 8 ft. [2.4 m] recycle width) are used, consideration should be given to requiring that two recyclers be used in tandem, each with a primary roller, to eliminate the need for reversing the recycling train back to the start of a section to do the second pass, along with the associated delays in starting blading to final level and final compaction, and (4) the importance of meeting the two-hour compaction completion specification requirement should be highlighted in all just-in-time training sessions for all cold recycling projects. These recommendations may change if lime is permitted as an active filler in the future, in which case additional testing will be required to determine whether the two-hour limit can be extended.
Suggested Citation
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cdl:itsdav:qt5qh4b6hj. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Lisa Schiff (email available below). General contact details of provider: https://edirc.repec.org/data/itucdus.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.