Abstract
This technical memorandum describes the design and construction of a full-scale test track and the construction quality control/quality assurance testing of the different materials, including subgrade, aggregate base, and asphalt mixes. Construction of the test track and the Heavy Vehicle Simulator (HVS) and laboratory testing that followed are part of the Caltrans balanced mix design (BMD) implementation effort led by the Pavement and Materials Partnering Committee (PMPC) BMD Working Group. The main goal of the test track evaluation was to compare the rutting performance of surface mixes under the HVS with laboratory rutting test results. A secondary goal was to compare the reflective cracking performance of the same mixes with laboratory cracking test results. The test track includes four lanes, each 177 ft. long, and each with a variation of a control hot mix asphalt (HMA) surface mix, with two sections in each lane for evaluation of either rutting or reflective cracking performance. The rutting evaluation sections had an asphalt long-life pavement structure designed and built to test the rutting performance of the surface layer under the HVS. The reflective cracking evaluation sections were an asphalt overlay on a jointed plain concrete pavement. The test track asphalt surface can be evaluated and replaced in successive testing rounds. Following PMPC BMD Working Group directions, the first round of testing focused on HMA Type A with plain binder, used in the construction documented in this document. The control mix, used for paving Lane 1 of the test track, was an HMA with 3/4 in. maximum aggregate size, 25% reclaimed asphalt pavement content (percent by aggregate replacement), and virgin binder graded as PG 58-22. Three alternative mixes were used for paving Lane 2, Lane 3, and Lane 4. The alternative mixes were intentionally designed to make the mixes susceptible to rutting. The construction of the subgrade, aggregate base, concrete slabs, and asphalt mixes went as expected, with no incidents to report. Overall, the asphalt mixes used for the construction matched the design expectations, and the field compaction was as expected.
Suggested Citation
Mateos, Angel & Buscheck, Jeff & Harvey, John & Yu, Justin & Wu, Rongzong & Rahman, Mohammad & Louw, Stephanus & Deng, Hanyu & Guada, Irwin & Brotschi, Julian & Jones, David, 2026.
"Balanced Mix Design Rut Test Validation Test Track: Construction of HMA Sections,"
Institute of Transportation Studies, Working Paper Series
qt2219w9s1, Institute of Transportation Studies, UC Davis.
Handle:
RePEc:cdl:itsdav:qt2219w9s1
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:cdl:itsdav:qt2219w9s1. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Lisa Schiff (email available below). General contact details of provider: https://edirc.repec.org/data/itucdus.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.