Author
Abstract
This chapter first proposes a priority evaluation method system for CCUS project deployment based on the requirements of global economic optimization and safety feasibility, and optimizes and prioritizes potential CCUS projects formed by 101 potential geological reservoirs and 1229 emission sources in China. Secondly, an investment decision model for CCUS projects is established to evaluate the investment feasibility of carbon capture and storage combined with enhanced oil recovery (CCS-EOR) projects and carbon capture and storage combined with enhanced water recovery (CCS-EWR) project based on our country’s existing emission sources. The results show that high-concentration emission sources located near oil fields such as Ordos, Zhungeer, and Songliao can form 22 profitable CCUS projects by storing CO2 in nearby oil fields, which should be the preferred choice for large-scale deployment of early CCUS projects in China. The economically suboptimal CCUS projects are saline aquifer storage projects implemented by high-concentration sources near the saline aquifer basins. The average cost of storing 2958 million tons of CO2 per year from 1229 sources in China is 683.16 yuan/ton. Taking the Sinopec CCS-EOR project as a case study for investment decision analysis (2019 as the first year of investment decision), the results show that the project should choose delayed investment, which can yield an option return of 12 million yuan. From the perspective of investment probability, 2022 is the best time to invest, and the latest investment time cannot exceed 2027; otherwise it will be difficult to recover costs. Taking the CCS-EWR project of Shenhua Group as a case study for investment decision-making (2019 as the first year of investment decision-making) analysis, the results show that project investment will be delayed until at least 2025 to obtain maximum investment value. However, regardless of whether to increase the EWR process or exemption from water resource fees, the commercial investment opportunities for existing high-concentration emission source projects are slim without other income.
Suggested Citation
Yi-Ming Wei, 2025.
"Feasibility Analysis of CCUS Projects Deployment,"
Springer Books, in: Carbon Mitigation System Engineering, chapter 15, pages 333-368,
Springer.
Handle:
RePEc:spr:sprchp:978-981-95-0371-1_15
DOI: 10.1007/978-981-95-0371-1_15
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-981-95-0371-1_15. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.