Author
Listed:
- Min Zhou
(Shenzhen University)
- Jiayuan Wang
(Shenzhen University)
Abstract
At the present stage, Prefabricated buildings are showing a good momentum of development, the whole industry chain each link research and implementation work steadily promoting development. However, its low level of informatization leads to such problems as low production efficiency, backward technical level and backward management concept. Moreover, the primary problem in various research work and implementation projects is the quality control of prefabricated buildings in the whole process. Aiming at the low efficiency of prefabricated building construction quality management and the quality management advantage of information frontier technology, this paper puts forward the prefabricated building quality management based on BIM + integration technology. Based on the detailed analysis and summary of the current situation of traditional building and prefabricated building quality management at home and abroad, and the implementation of information leading edge technology advantages in the construction industry, this paper studies the whole process quality management of prefabricated building based on BIM + integration technology. This paper analyzes the advantages and application points of cutting-edge information technologies, such as BIM technology, Internet of things technology, VR technology, etc., and studies the characteristics and application points of BIIM + integration technology. On this basis, the quality management system of prefabricated building with information frontier technology is constructed. Furthermore, by combining the key points of prefabricated building quality management and the entry point of quality control of information frontier technology, this paper puts forward six key points of prefabricated building quality management based on information frontier technology. Also, it provides a new idea for how to improve the quality management efficiency of prefabricated buildings. With the acceleration of information process and the rapid development of building industry, the application and popularization of prefabricated building information is imperative. Applying the management mode of information frontier technology to prefabricated buildings can further promote the development of prefabricated buildings and improve the quality of prefabricated buildings.
Suggested Citation
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-981-15-8892-1_138. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.