Abstract
Manufacturing systems can be characterized by a variety of factors: the number of resources or machines, their characteristics and configuration, the level of automation, the type of material handling system, and so on. The differences in all these characteristics give rise to a large number of different planning and scheduling models. In a manufacturing model, a resource is usually referred to as a “machine”; a task that has to be done on a machine is typically referred to as a “job”. In a production process, a job may be a single operation or a collection of operations that have to be done on various different machines. Before describing the main characteristics of the planning and scheduling problems considered in Part II of this book, we give a brief overview of five classes of manufacturing models. The first class of models are the project planning and scheduling models. Project planning and scheduling is important whenever a large project,that consists of many stages,h as to be carried out. A project,su ch as the construction of an aircraft carrier or a skyscraper,t ypically consists of a number of activities or jobs that may be subject to precedence constraints. A job that is subject to precedence constraints cannot be started until certain other jobs have been completed. In project scheduling,it is often assumed that there are an unlimited number of machines or resources,so that a job can start as soon as all its predecessors have been completed. The objective is to minimize the completion time of the last job,com monly referred to as the makespan. It is also important to find the set of jobs that determines the makespan,as these jobs are critical and cannot be delayed without delaying the completion of the entire project. Project scheduling models are also important in the planning and scheduling of services. Consider,fo r example, the planning and scheduling of a large consulting project.
Suggested Citation
Michael L. Pinedo, 2009.
"Manufacturing Models,"
Springer Books, in: Planning and Scheduling in Manufacturing and Services, edition 2, chapter 0, pages 19-35,
Springer.
Handle:
RePEc:spr:sprchp:978-1-4419-0910-7_2
DOI: 10.1007/978-1-4419-0910-7_2
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-1-4419-0910-7_2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.