Author
Listed:
- Adiel Teixeira Almeida
(Universidade Federal de Pernambuco)
- Cristiano Alexandre Virgínio Cavalcante
(Universidade Federal de Pernambuco)
- Marcelo Hazin Alencar
(Universidade Federal de Pernambuco)
- Rodrigo José Pires Ferreira
(Universidade Federal de Pernambuco)
- Adiel Teixeira Almeida-Filho
(Universidade Federal de Pernambuco)
- Thalles Vitelli Garcez
(Universidade Federal de Pernambuco)
Abstract
An important issue related to maintenance management is the problem of sizing the amount of spare parts. An excess number of spare parts results in financial losses. However, a lack of spare parts is also negative, because this may result in a loss of production due to the increased downtime of equipment. Therefore, spare parts should be available in quantity and at the right time. Spare part planning decisions need to evaluate multidimensional objectives, such as costs, profitability, reliability, availability and probability of stockout. Typically, these objectives are conflicting. Unlike a single objective approach, which often implies the poor performance of other objectives desired by the decision maker (DM), a multicriteria (MCDM/A) approach provides a spectrum of compromise solutions, which reflect the tradeoffs represented by DM’s preference structure, by using a multi-attribute utility function. Another relevant aspect is the management of uncertainties about the reliability or maintainability of the system, using the concepts of Decision Theory and a Bayesian approach, which incorporate experts’ prior knowledge. This chapter presents a model, based on Multi-attribute Utility Theory (MAUT), for spare parts sizing that considers aspects of the risk of inventory shortages and cost. Furthermore, an NSGA-II multi-objective model for multiple spare parts sizing is discussed. Finally, a model considering condition-based maintenance (CBM) is presented.
Suggested Citation
Adiel Teixeira Almeida & Cristiano Alexandre Virgínio Cavalcante & Marcelo Hazin Alencar & Rodrigo José Pires Ferreira & Adiel Teixeira Almeida-Filho & Thalles Vitelli Garcez, 2015.
"Spare Parts Planning Decisions,"
International Series in Operations Research & Management Science, in: Multicriteria and Multiobjective Models for Risk, Reliability and Maintenance Decision Analysis, edition 127, chapter 0, pages 273-296,
Springer.
Handle:
RePEc:spr:isochp:978-3-319-17969-8_8
DOI: 10.1007/978-3-319-17969-8_8
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:isochp:978-3-319-17969-8_8. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.