Decision-Making in 1D Cutting of Blanks for Wind Turbine Manufacturing and Processing Planning

In: Decision-Making in Design, Maintenance, Planning, and Investment of Wind Energy

Author

Listed:
  • Daniela Borissova

    (Bulgarian Academy of Sciences)

Abstract

The third stage of the wind farm life cycle refers to the actual construction and commissioning. Activities related to this stage refer to logistics, civil engineering, foundations, turbine installation, grid connection, etc. Generally, wind turbines consist of three main components—blades, tower, and nacelle—each of which must be designed and manufactured separately. However, the heart of the wind turbine remains the nacelle, containing the gears, generator, and other mechanical components of the turbine. In addition to these components, there are also many high-tech electronic components that allow the turbine to monitor changes in wind speed and direction, turn on and off, or automatically change direction. Wind turbines, as complex machines, are designed and manufactured by companies known as original equipment manufacturers. Such manufacturers are in most cases multinational corporations that rely on many smaller businesses to construct the individual components and systems that make up a wind turbine. Given the growing wind energy market, many original equipment manufacturers are looking to localize production to reduce transportation costs and potentially reduce the logistical challenges associated with transporting large turbines and components. That means the wind industry supports many small companies that manufacture specialized parts, including gears. One major problem at the stage of construction and commissioning is the problem of stock-cutting. This problem arises when the available material has to be cut to fulfill certain goals such as cutting patterns with minimal material waste and cost-efficient production and higher customer satisfaction. Another important problem at this stage is personnel scheduling. Therefore, the models described in this chapter are designed to optimize the processes for the required details processing and determine the optimal number of personnel for wind turbine installation.

Suggested Citation

  • Daniela Borissova, 2024. "Decision-Making in 1D Cutting of Blanks for Wind Turbine Manufacturing and Processing Planning," International Series in Operations Research & Management Science, in: Decision-Making in Design, Maintenance, Planning, and Investment of Wind Energy, chapter 0, pages 165-205, Springer.
  • Handle: RePEc:spr:isochp:978-3-031-52219-2_4
    DOI: 10.1007/978-3-031-52219-2_4
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:isochp:978-3-031-52219-2_4. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.