IDEAS home Printed from https://ideas.repec.org/h/spr/advbcp/978-94-6463-585-0_24.html

Analysis of Total Productivity Maintenance to Increase Batching Plant Machine Productivity at Moving Plant PT Adhi Persada Beton in Yogyakarta

In: Proceedings of the 5th International Conference on Global Innovation and Trends in Economy 2024 (INCOGITE 2024)

Author

Listed:
  • Eka Bambang Gusminto

    (University of Jember)

  • Muhammad Naufal Mahardika

    (University of Jember)

  • Isti Fadah

    (University of Jember)

  • Handriyono

    (University of Jember)

  • Regina Niken Wilantari

    (University of Jember)

  • Markus Apriono

    (University of Jember)

  • Siti Maria Wardayati

    (University of Jember)

Abstract

This study was conducted on a batching machine at the movable plant of PT Adhi Persada Beton in Yogyakarta. The purpose is to determine the productivity level of a batching plant machine and analyze what factors that can decrease the machine’s productivity. Source of data used in this study are secondary data, collected from the machine’s performance history that was recorded from July 2023 to January 2024. The methods of analysis of this study are using the Overall Equipment Effectiveness (OEE) method and Six Big Losses. Based on a calculation of these two methods, we obtained the OEE value of the batching plant of PT Adhi Persada Beton is above the JIPM standard value of about 88.3%, and the calculation results of six big losses describe that set-up and adjustment losses are the main cause of the decreased OEE value of the machine that about 6.49%. Based on fishbone diagram analysis, the causes of decreased OEE value are environmental factors, humans, machines, methods, and materials. Based on Total Productivity Maintenance (TPM) analysis, the improvement can be carried out by training the employees, conducting periodic evaluations, forming SOPs that are related to the maintenance of the machine, and increasing employee awareness.

Suggested Citation

  • Eka Bambang Gusminto & Muhammad Naufal Mahardika & Isti Fadah & Handriyono & Regina Niken Wilantari & Markus Apriono & Siti Maria Wardayati, 2024. "Analysis of Total Productivity Maintenance to Increase Batching Plant Machine Productivity at Moving Plant PT Adhi Persada Beton in Yogyakarta," Advances in Economics, Business and Management Research, in: Soebowo Musa & Eric J. Nasution & Derek Ong Lai Teik & Hanny N. Nasution & Gilbert M. Tumibay & Amiz (ed.), Proceedings of the 5th International Conference on Global Innovation and Trends in Economy 2024 (INCOGITE 2024), pages 329-343, Springer.
  • Handle: RePEc:spr:advbcp:978-94-6463-585-0_24
    DOI: 10.2991/978-94-6463-585-0_24
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a
    for a similarly titled item that would be available.

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:advbcp:978-94-6463-585-0_24. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.