Author
Listed:
- Stephan A. Hulukati
(University of Brawijaya, Doctoral Program of Environmental Studies)
- Qomariyatus Sholihah
(University of Brawijaya, Department of Industrial Engineering, Faculty of Engineering)
- Marjono
(University of Brawijaya, Department of Mathematics)
- Nuddin Harahab
(University of Brawijaya, Faculty of Fisheries and Marine Science)
Abstract
Solar Power Plants can be a solution for future electricity needs in increasing Indonesia’s environmentally friendly economy. It can save electricity costs more significantly than fossil energy sources such as coal. It is a profitable investment as Solar Power Plant is proven more environmentally friendly for not causing much pollution. It even helps increase electrical energy capacity. It is very strategic in supporting the direction of leading industrial cluster development in the Sulawesi region, particularly in helping overcome the electricity crisis in Gorontalo City. The Gorontalo City Government must continue to make various efforts to be energy independent in building investment in Gorontalo City. The research sample was the trial results of Internet of Things (IoT)-based monitoring instruments for measuring temperature and humidity. The results of observations on the testing of the instruments illustrated that the difference graph at high humidity with hot air conditions indicated the production of electrical energy on the solar panels. Another condition was the humidity due to weather factors was high. It was covered by clouds above the instruments set up on the building of Universitas Ichsan Gorontalo. The measurement results proved that the roof of the building of Universitas Ichsan Gorontalo is a potential area for the rooftop construction of the Solar Power Plant. Its building roof is uniquely curved with varying slopes. No other buildings share the same large area for an evenly distributed temperature around Universitas Ichsan Gorontalo in Gorontalo city.
Suggested Citation
Stephan A. Hulukati & Qomariyatus Sholihah & Marjono & Nuddin Harahab, 2023.
"The Temperature and Humidity Measurement for the Rooftop Type of Solar Power Plant Development Planning at the Building of Universitas Ichsan Gorontalo,"
Advances in Economics, Business and Management Research, in: Yusfan Adeputera Yusran & Femiana Gapsari Madhi Fitri & Titin Andri Wihastuti & Fajar Ari Nugroho & (ed.), Proceedings of the 2022 Brawijaya International Conference (BIC 2022), pages 252-262,
Springer.
Handle:
RePEc:spr:advbcp:978-94-6463-140-1_25
DOI: 10.2991/978-94-6463-140-1_25
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:advbcp:978-94-6463-140-1_25. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.