Abstract
A toll road is one of the National Strategic Projects with complete problems and needs highspeed performance during construction. So, contract construction that is usually applied to these projects is design and build contract. Furthermore, best practice for Design and Build is combined with Lump Sum as an estimation cost aspect, so the type of contract used is Design and Build Lump Sum Price. This study aims to review the implementation of the Design and Build Lup Sum Price Contract based on the terms and conditions in the Indonesian Legislation and FIDIC on the Trans Sumatra Toll Project Kuala Tanjung – Inderapura Section 2 according to the contractor’s point of view to mitigating the negative risks that arise especially in the financial aspect. This research is descriptive research with a qualitative data analysis method by comparing the implementation of the contract according to the applicable law. The first step was to collect secondary data in a contractual resume, then make a study based on existing legal standards. Based on the results, it can be stated that the design and build Lump Sum price contract is a construction work contract in order to complete a job within a certain period of time according to the basic design scope as the basis for quotation, which has fixed costs as long as no intervention results in changes contract documents that may give additional payments for the rights. In the construction of the Kuala Tanjung – Inderapura Toll Road Section 2, there was an additional scope of the contract which resulted in additional work due to instructions from the owner and other parties, as well as an intervention to change specifications due to differences in the basic design at the tender which poses negative risks to the financial aspect for the contractor.
Suggested Citation
Cut Riska Irnanda & Isfenti Sadalia & Nazaruddin, 2023.
"Contract Analysis for Design and Build Lump Sum Price,"
Advances in Economics, Business and Management Research, in: Werner Ria Murhadi & Dudi Anandya & Noviaty Kresna Darmasetiawan & Juliani Dyah Trisnawati & Putu An (ed.), Proceedings of the 19th International Symposium on Management (INSYMA 2022), pages 1162-1169,
Springer.
Handle:
RePEc:spr:advbcp:978-94-6463-008-4_143
DOI: 10.2991/978-94-6463-008-4_143
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:advbcp:978-94-6463-008-4_143. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.