IDEAS home Printed from https://ideas.repec.org/h/spr/advbcp/978-94-6463-008-4_142.html

Measurement of Supply Chain Management Performance on Toll Road Projects with Design and Build Contract Using SCOR and AHP Methods

In: Proceedings of the 19th International Symposium on Management (INSYMA 2022)

Author

Listed:
  • Achmad Fauzi

    (University of North Sumatera)

  • Nazaruddin

    (University of North Sumatera)

  • Rulianda Purnomo Wibowo

    (University of North Sumatera)

Abstract

Infrastructure performance was a highlight in the World Economic Forum, thus encouraging countries worldwide, including Indonesia, to be motivated to accelerate the provision of infrastructure facilities. One of the infrastructures that continues to be improved is toll roads, and a design and build contract scheme is chosen, which in theory has the characteristics of a faster time in infrastructure provision. This project experienced delays caused by supply chain problems for the main materials, namely rebar and concrete. This study aims to measure the performance of supply chain management for rebar and concrete materials that cause project delays of 3.251%. The population in this study was 25 contractors who understood and were involved in the supply chain management process for rebar and concrete materials. This type of research is a descriptive causal study that uses a quantitative approach and uses SCOR and AHP as analytical tools. The results show that the supply chain management performance assessment for rebar and concrete materials is 64.36 out of a scale of 100. This indicates that the supply chain management performance in toll road construction projects is at an average level. This performance is much influenced by the scarcity of materials from suppliers at certain times and the design process that coincides with the construction period, causing long waiting times for adjusting the order quantity. Based on the AHP, it was found that the most dominant variables were Plan and Source. Thus, it can be concluded that the performance of delayed toll road construction projects is influenced by the performance of the rebar and concrete supply chain. For toll road projects with design and build contracts, the corrective steps must focus on Plan and Source so that the performance level increases and can avoid the risk of delays that are detrimental to service providers.

Suggested Citation

  • Achmad Fauzi & Nazaruddin & Rulianda Purnomo Wibowo, 2023. "Measurement of Supply Chain Management Performance on Toll Road Projects with Design and Build Contract Using SCOR and AHP Methods," Advances in Economics, Business and Management Research, in: Werner Ria Murhadi & Dudi Anandya & Noviaty Kresna Darmasetiawan & Juliani Dyah Trisnawati & Putu An (ed.), Proceedings of the 19th International Symposium on Management (INSYMA 2022), pages 1152-1161, Springer.
  • Handle: RePEc:spr:advbcp:978-94-6463-008-4_142
    DOI: 10.2991/978-94-6463-008-4_142
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a
    for a similarly titled item that would be available.

    More about this item

    Keywords

    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:advbcp:978-94-6463-008-4_142. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.