Author
Abstract
China’s construction industry is developing rapidly, and market investment is out of control. Therefore, accurate and rapid project cost estimation is the focus of the industry. The grey theory system is a method to study the uncertainty problem of little data and poor information. It can excavate different information hidden in the system observation data to achieve correct description and understanding. The research will improve the BP neural network based on grey theory, and verify the exactitude and advantage of the model from performance comparison and empirical analysis. This study can make the project cost forecast more reasonable. Results show that compared with the traditional model, the maximum error value decreased by 0.52, the research model’s maximum mean square error decreased by 0.09, and the variance decreased by 0.13. In the regression analysis, the R-value of the model fitting was above 0.95, the R-value of the verification fitting reached 0.9205. The R-value of the overall fitting reached 0.9475, and the fitting effect was excellent. The convergence speed of the research model is faster than other models, and the fitness value is stable at 1.36. In the empirical analysis, this model can review project cost investment budgets in some areas and reduce project costs. This can improve work efficiency. The model also has certain practical significance for the sustainable development of construction project cost estimates.
Suggested Citation
Limei Wei, 2024.
"Design of Sustainable Construction Cost Estimation System Based on Grey Theory — BP Model,"
Journal of Information & Knowledge Management (JIKM), World Scientific Publishing Co. Pte. Ltd., vol. 23(02), pages 1-17, April.
Handle:
RePEc:wsi:jikmxx:v:23:y:2024:i:02:n:s0219649224500114
DOI: 10.1142/S0219649224500114
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:jikmxx:v:23:y:2024:i:02:n:s0219649224500114. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscinet.com/jikm/jikm.shtml .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.