Author
Listed:
- Qian Wu
- Yang Li
- Qianguo Lin
- Zhaojie Xue
- Ruyi Lin
Abstract
Carbon capture, utilization, and storage (CCUS) clusters present a critical pathway for regional low‐carbon transition. Yet, most CCUS clusters proposed several years ago remain at the conceptual design stage due to systemic complexities involving uncertainties and dynamics. We therefore developed an inexact dynamic source–sink matching (SSM) optimization model for CCUS cluster systems planning under uncertainty. Aligning with technological maturity and large‐scale infrastructure needs, this study specifically denotes CO2 utilization as CO2‐enhanced oil recovery (CO2‐EOR) and exclusively considers pipeline transport. Through integrating interval linear programming (ILP), chance‐constrained programming (CCP), and mixed‐integer programming (MIP) into an optimization framework, the model can not only address uncertainties expressed as interval values and probability distributions but also solve siting, timing, and capacity‐expansion problems within a multi‐period and multi‐option context. The model was then applied to a long‐term CCUS cluster case study in East China. Interval solutions linked to constraint‐violation risk levels were generated to support SSM schemes for CCUS cluster planning. Moreover, when pi${{p}_i}$ increases from 0.01 to 0.1, system costs decrease from $4790.61–$6446.68 to $4652.55–$6273.40 million, which indicated that a desire for cost reduction would increase system instability risks. Optimal CO2 allocation from sources to sinks and capacity‐expansion plans were provided through a compromise among system optimality, reliability, and costs, thereby robustly reflecting the system complexities and uncertainties. Therefore, the developed model can tackle dynamics and interactions of CCUS cluster and help decision‐makers identify adaptive SSM strategies for supporting medium‐ or long‐term planning of CCUS cluster projects.
Suggested Citation
Qian Wu & Yang Li & Qianguo Lin & Zhaojie Xue & Ruyi Lin, 2025.
"Development of an Inexact Dynamic Source–Sink Matching Optimization Model for CCUS Cluster System Planning Under Uncertainty,"
Greenhouse Gases: Science and Technology, Blackwell Publishing, vol. 15(6), pages 696-712, December.
Handle:
RePEc:wly:greenh:v:15:y:2025:i:6:p:696-712
DOI: 10.1002/ghg.2364
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:greenh:v:15:y:2025:i:6:p:696-712. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)2152-3878 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.