Author
Listed:
- Shakharov Azamat
(School of Engineering, Cardiff University, Cardiff, UK)
- Beach Thomas
(School of Engineering, Cardiff University, Cardiff, UK)
- Rezgui Yacine
(School of Engineering, Cardiff University, Cardiff, UK)
Abstract
In recent years, automation in construction scheduling has gained popularity due to advancements in digital construction, yet it has not achieved widespread adoption. Significant challenges remain in developing adaptive schedules that effectively manage unforeseen events and construction delays. This study addresses a critical research gap by evaluating the automation levels of individual construction planning processes, an area previously underexplored. Employing a systematic literature review, this study investigates the state of the art in automated, dynamic and adaptive scheduling techniques. The review examined proposed planning procedures, assessing the extent of automation in key aspects of construction scheduling, including task sequencing, resource allocation and task duration estimation, with a focus on building information modelling (BIM) integration. The analysis reveals limited adoption of automated scheduling, BIM technologies and adaptive scheduling methods. Future research should explore advanced automation approaches, enhance BIM integration and develop adaptive scheduling solutions to improve efficiency and responsiveness in construction management.
Suggested Citation
Shakharov Azamat & Beach Thomas & Rezgui Yacine, 2025.
"Automated and adaptable construction work scheduling: a roadmap,"
Organization, Technology and Management in Construction, Sciendo, vol. 17(1), pages 239-259.
Handle:
RePEc:vrs:otamic:v:17:y:2025:i:1:p:239-259:n:1014
DOI: 10.2478/otmcj-2025-0014
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:17:y:2025:i:1:p:239-259:n:1014. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.