IDEAS home Printed from https://ideas.repec.org/a/vrs/gosmin/v33y2017i3p49-70n6.html
   My bibliography  Save this article

Discount rate selection for long-term sequential mineral projects

Author

Listed:
  • Saługa Piotr W.

    (Dr hab. inż., prof. AGH, AGH Akademia Górniczo-Hutnicza, Wydział Zarządzania, Kraków, Poland)

Abstract

Mineral projects depict various specific features that differentiate them from alternative investments in other industries. Among these features, one can specify unique characteristics of mineral deposits such as scarcity, geological setting and structure, resource/reserve uncertainty and depletability. Resource uncertainty results in the sequential nature of operations (exploration, development and production stages). Other specific features of mineral projects include long investment - and production periods, high capital intensity, varying production conditions, unpredictability and high volatility of mineral prices, etc. Specific features of mineral projects are sources of exceptionally high risks. To ensure the payback of high capital costs these significant risks must be addressed in the economic evaluation of a mineral project. In the discounted cash flow analysis, DCF, which is the most commonly used in evaluations of such ventures, all project uncertainties are reflected in a level of the discount rate used for the actualization of future cash flow values. The riskier project has a higher discount rate. Apart from being extremely high risk, mineral projects are both sequential and long-term - the first feature means that the extent of a project risk decreases dramatically over time, and second - that care should be taken when evaluating these projects because cash flows arising in later years of the project lifetime have little value. The paper delivers a proposal to apply the time-varying discount rate to the economic evaluation of a mineral project. The first part introduces a commonly accepted approach to evaluating discount rates along with conceptions of adjusting them to risks of individual projects. In the following sections, the article presents the current practice in the setting of discount rates for mineral projects and then a proposed modification of this approach by introducing the time-varying discount rate. In the end, a verification of the proposed suggestion based on a copper project example has been delivered.

Suggested Citation

  • Saługa Piotr W., 2017. "Discount rate selection for long-term sequential mineral projects," Gospodarka Surowcami Mineralnymi / Mineral Resources Management, Sciendo, vol. 33(3), pages 49-70, September.
  • Handle: RePEc:vrs:gosmin:v:33:y:2017:i:3:p:49-70:n:6
    DOI: 10.1515/gospo-2017-0036
    as

    Download full text from publisher

    File URL: https://doi.org/10.1515/gospo-2017-0036
    Download Restriction: no

    File URL: https://libkey.io/10.1515/gospo-2017-0036?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:gosmin:v:33:y:2017:i:3:p:49-70:n:6. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.