Interpretation of Mathematical Model of Measurement of a Public Work Cost after Contractor Selection and before the Start of Contractual Activities

Author

Listed:
  • Metallinos Pavlos

    (School of Science and Technology, Patra, Greece Hellenic Open University,Patra, Greece)

Abstract

The manuscript focuses on the situation before the execution of construction activities starting and after the crystallization of the contractual object between Public Authority and contractor. The aim of the article is to investigate the interpretation of mathematical model of measurement of a public work cost after contractor’s selection and before the start of contractual activities. Our study results have been drawn through the interpretation of equations, which have been extracted by the study of the multiparameter polynomial, as these have been developed and proven in the study “Measurement of the Cost of a Public Works Project: The Case of Greece”. Taking advantage of the mathematical model, which was defined in the previous study, we develop the comprehension of critical conditions, which determine finally the equivalent in money of cost of each technical commodity for the purchaser and shape the execution conditions of competition in the construction market. Due to the relation of Hellenic legislation with that of EU, the suggested mathematical cost measurement model of a public work and the conclusions of the present article can be used in further study related to a critical evaluation between Earned Value Management Method and Earned Schedule Method. Despite the Hellenic experience, the approach of cognitive object and the conclusions which are reached could be applied in the international practice, if we take into consideration that the process of contractor’s selection that is used at least in the European Union, is similar.

Suggested Citation

  • Metallinos Pavlos, 2018. "Interpretation of Mathematical Model of Measurement of a Public Work Cost after Contractor Selection and before the Start of Contractual Activities," Baltic Journal of Real Estate Economics and Construction Management, Sciendo, vol. 6(1), pages 131-143, October.
  • Handle: RePEc:vrs:bjrecm:v:6:y:2018:i:1:p:131-143:n:10
    DOI: 10.2478/bjreecm-2018-0010
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/bjreecm-2018-0010
    Download Restriction: no

    File URL: https://libkey.io/10.2478/bjreecm-2018-0010?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Pavlos Metallinos, 2013. "Application of mathematical method in public works tendering in Greece," European Journal of Law and Economics, Springer, vol. 35(3), pages 397-407, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.

      Corrections

      All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:bjrecm:v:6:y:2018:i:1:p:131-143:n:10. See general information about how to correct material in RePEc.

      If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

      If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

      If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

      For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

      Please note that corrections may take a couple of weeks to filter through the various RePEc services.

      IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.