- Diean Oktavian Regar
(Faculty of Engineering, Lambung Mangkurat University, Jl. A. Yani Km. 35.8, South Borneo, Indonesia)
- Aqli Mursadin
(Faculty of Engineering, Lambung Mangkurat University, Jl. A. Yani Km. 35.8, South Borneo, Indonesia)
Abstract
PT Adaro Indonesia is trying to adjust a vertical clearance under Tabalong Bridge 1 (unloaded) and Tabalong Bridge 2 (loaded) because the existing conditions still apply a minimum vertical clearance of 4 m. I t should be in accordance with latest Regulation of the Minister of Public Works No. 19/PRT/M/2011 that for vertical clearance above national road at least 5.1 m. This specification has not been met by the national road under the Tabalong 1 & 2 Bridges bec ause both bridges were built in the 90s. Therefore we need an engineering technique to overcome this. There are 2 alternative designs, namely lowering the elevation of the national road and increasing the elevation of the bridge's upper structure to mitiga te oversized vehicles so as not to hit the lower structure of the Tabalong bridge. In determining the selection of the best alternative designs in this research is based on two (2) things, non financial criteria with Analytical Hierarchy Process (AHP) and financial criteria with Life Cycle Cost Analysis (LCCA)/Benefit Cost Ratio (BCR) method. This study uses a survey method by distributing questionnaires and interviews as a means of collecting primary data. In addition, previous research and consultant DED documents were used as a means of collecting secondary data. The AHP method is used to process primary data to produce a decision from a non financial aspect. While the LCC/BCR method is used to process secondary data to produce a decision from the financi al aspect . The results of the AHP analysis obtained that the synthesis value of the decision the option of lowering national roads was 85% and the bridge lifting option was 15% and the consistency ratio (CR) was 0.05 1 and NPV = Rp. 43,442,264,804.34 > 1 means that the option lowering national roads is feasible. While the bridge li fting option is obtained by analyzing the value of BCR = 0.98
Suggested Citation
Diean Oktavian Regar & Aqli Mursadin, 2022.
"Analysis of alternative selection for vertical clearance design under Tabalong Bridge of PT Adaro Indonesia,"
Technium, Technium Science, vol. 4(1), pages 7-30, January.
Handle:
RePEc:tec:techni:ojs:5600
DOI: 10.47577/technium.v4i1.5600
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tec:techni:ojs:5600. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ana Maria Golita (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.