IDEAS home Printed from https://ideas.repec.org/a/tec/techni/ojs5220.html

Comparing the use of modern and traditional building design systems in construction projects

Author

Listed:
  • M.Sc. Yasser Sahib Nassar

    (College of physical Planning, University of Kufa, Najaf, Iraq)

Abstract

Any construction project through several stages, starting from the feasibility study stage to the project delivery stage, as the most critical stage that must be focused on is the design stage. It was essential to adopt modern and advanced programs at the design stage to avoid problems and claims between the employer and the contractor due to changes and errors that occur in the project—design process. BIM is one of the modern technologies with many benefits that can be used to solve these errors and obstacles. This research aims to clarify the effectiveness of introducing the BIM system in the design stage of the construction building by comparing it with traditional CAD systems. In this research, ten different actual projects were studied in the architectural design stage to be used in the comparison process between BIM and CAD systems. The researcher reached a set of results, including that introducing the (BIM) in the architectural and structural design stage can reduce the time required to produce design documents by up to (67.6%). This study is helpful for all governmental and private design companies and encourages decision-makers to use the BIM system.

Suggested Citation

  • M.Sc. Yasser Sahib Nassar, 2021. "Comparing the use of modern and traditional building design systems in construction projects," Technium, Technium Science, vol. 3(10), pages 82-93, November.
  • Handle: RePEc:tec:techni:ojs:5220
    DOI: 10.47577/technium.v3i10.5220
    as

    Download full text from publisher

    File URL: https://techniumscience.com/index.php/technium/article/view/5220
    Download Restriction: no

    File URL: https://libkey.io/10.47577/technium.v3i10.5220?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tec:techni:ojs:5220. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ana Maria Golita (email available below). General contact details of provider: .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.