Abstract
New methods of construction projects to increase quality, reduce time and thus reduce costs have always been considered by construction engineers and stakeholders in the project. One of these new methods and technologies is building information modeling (BIM). The purpose of this study is to review and analyze the building information modeling (BIM) method and prioritize the factors affecting the challenge in establishing this system in the country. For this purpose, while determining the failure factors in the implementation of building information modeling system according to experts and through a questionnaire, the weight and importance of these factors were determined using the network analysis process (ANP) model and the factors were prioritized. The results obtained according to the opinions of experts and according to a binary comparison of the main criteria studied showed that the most factors that cause the failure of BIM in construction projects include technical, financial, human resources and time problems, respectively. Other results showed that four sub-criteria of information dispersion and lack of integrated system with a weight of 0.2277, complex program space with a weight of 0.1634, high design cost with BIM software with a weight of 0.1578 and the need for different office staff for a project weighing 0.1352 Sequence has been the most important and therefore the most influential in prioritizing the factors of BIM failure. By identifying the effective causes of the challenges of non-realization of BIM, preventive measures can be taken to prevent the failure of such projects and put them on the path to success. Considering the factors that have hindered the realization of BIM in construction projects, it can be said that building information modeling in construction projects needs the support of senior managers to implement it, which in itself depends on the reasons mentioned. Because by removing the obstacles in front of it, in order to optimally manage resources and time, etc., managers may be willing to use it.
Suggested Citation
Mohammad Amin Oyarhossein & Seyed Hamid Bayat Ghiasi & Vahid Khiali, 2021.
"Identifying barriers of Implementing BIM in Construction,"
Technium, Technium Science, vol. 3(6), pages 9-20, July.
Handle:
RePEc:tec:techni:ojs:3032
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tec:techni:ojs:3032. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ana Maria Golita (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.