Author
Listed:
- Zahra Aulia
(Master Program of Civil Engineering, Lambung Mangkurat University)
- Aqli Mursadin
(Faculty of Engineering, Lambung Mangkurat University)
Abstract
Government building construction projects represent a complex series of activities requiring massive resource integration with strict constraints on cost, quality, and time. The high complexity of work involving cross-disciplinary coordination potentially generates various forms of waste, defined as activities that consume resources without adding value (non-value-adding activities). This study aims to identify the dominant waste factors, analyze their root causes, and formulate mitigation strategies based on the lean construction approach. The essential concept of lean construction relies on detecting and eliminating seven classifications of waste, which encompass overproduction, waiting, transportation, inappropriate processing, excess inventory, unnecessary motion, and defects. Through the systematic reduction of non-value-adding activities, project execution can achieve significantly higher efficiency, accelerated timelines, and greater cost-effectiveness. Data collection was conducted through observations, interviews, and the distribution of questionnaires to project practitioners. Quantitative data analysis was performed using validity and reliability tests, followed by the Borda method for ranking the dominant factors, and Root Cause Analysis (RCA) integrated with the 5 Whys technique to ascertain the root causes. The research findings confirm three primary wastes: (1) Waiting due to unfavorable weather conditions (score 174; weight 0.203), (2) Overproduction in the form of premature material fabrication (score 88; weight 0.117), and (3) Inappropriate Processing manifested as a high frequency of rework (score 114; weight 0.166). The 5 Whys synthesis reveals that these inefficiencies are rooted in the field management's heavy reliance on a highly rigid, conventional scheduling system (Push System). As a proposed improvement, lean construction mitigation strategies were formulated, encompassing the application of the Last Planner System (LPS) and Daily Huddles to adaptively manage weather constraints; the implementation of a Pull System and Work-in-Progress (WIP) limits to regulate the rate of Overproduction; and the application of Built-in Quality principles utilizing Poka-Yoke instruments to prevent repetitive rework.
Suggested Citation
Zahra Aulia & Aqli Mursadin, 2026.
"Lean Construction Approach for Handling Waste in Government Building Construction Work,"
Technium, Technium Science, vol. 31, pages 391-401, June.
Handle:
RePEc:tec:techni:ojs:13704
DOI: 10.47577/technium.v31i.13704
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tec:techni:ojs:13704. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ana Maria Golita (email available below). General contact details of provider: .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.