Author
Listed:
- Satie L. Takeda-Berger
- Enzo M. Frazzon
Abstract
Scheduling is a complex task due to the need to optimise multiple competing objectives and react to unpredictable events that may occur during production execution. The strategy of predictive-reactive scheduling can be used to reconcile the conflict between the original schedule and the current shop floor situation. This study seeks to present an inventory data-driven predictive-reactive production scheduling model that supports the evolving concepts of the Industry 4.0. Periodically, a machine learning technique provides predictive scheduling considering a best-case scenario according to an established Key Performance Indicator (KPI). Then, material non-availability causes disruptions in production, which triggers the Simulation-Based Optimization (SBO) method to handle these events. Thus, SBO provides a reactive schedule with the best set of priority rules to sequence jobs on each machine according to the data on the shop floor. This model was validated with a real case study using data collected from a metal-mechanical company. Considering the service level KPI, the results showed that the model is able to find a better solution in the compared scenarios. Therefore, even in a dynamic and stochastic scenario, with machine breakdowns, quality problems, raw material delays, and accuracy issues, the model proved efficient in mitigating these variations’ effects.
Suggested Citation
Satie L. Takeda-Berger & Enzo M. Frazzon, 2024.
"An inventory data-driven model for predictive-reactive production scheduling,"
International Journal of Production Research, Taylor & Francis Journals, vol. 62(9), pages 3059-3083, May.
Handle:
RePEc:taf:tprsxx:v:62:y:2024:i:9:p:3059-3083
DOI: 10.1080/00207543.2023.2217297
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:62:y:2024:i:9:p:3059-3083. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.