IDEAS home Printed from https://ideas.repec.org/a/taf/tjorxx/v76y2025i10p2112-2131.html
   My bibliography  Save this article

Priority rule-based heuristics for distributed multi-project scheduling considering global resource failures

Author

Listed:
  • Xuejun Hu
  • Jiaojiao Li
  • Feifei Li
  • Jianjiang Wang
  • Yuhao Wang

Abstract

In fields such as construction engineering, maintenance services, and globalized manufacturing, enterprises widely adopt a distributed management mode to coordinate and manage multiple projects sharing global resources. Under this management mode, the distributed resource-constrained multi-project scheduling problem (DRCMPSP) has gradually become a core issue in both project management practices and academic research. This article investigates the intricacies of global resource uncertainty within the DRCMPSP framework, meticulously portraying resource failures through a scenario-oriented approach. With the aim of obtaining a high-quality baseline schedule and adeptly countering the consequences of global resource failures, a comprehensive two-phase DRCMPSP planning-repairing model is established. Additionally, a heuristic algorithm, grounded in a Graded Scoring Rule (GSR) and Repairing Graded Scoring Rule (RGSR), is proposed to solve the model. Extensive simulation experiments carried out on the MPSPLIB problem library demonstrate that the GSR/RGSR excels in handling large-scale instances. As global resource conflicts increase, the competition among projects for resources intensifies, and the utilization of GSR/RGSR proves to be significantly more effective in mitigating project delays and reducing stability costs in comparison to other rules. Furthermore, the GSR/RGSR demonstrates remarkable adaptability to variations in problem size and resource conflict intensity, delivering more consistent and dependable optimization outcomes.

Suggested Citation

  • Xuejun Hu & Jiaojiao Li & Feifei Li & Jianjiang Wang & Yuhao Wang, 2025. "Priority rule-based heuristics for distributed multi-project scheduling considering global resource failures," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 76(10), pages 2112-2131, October.
  • Handle: RePEc:taf:tjorxx:v:76:y:2025:i:10:p:2112-2131
    DOI: 10.1080/01605682.2025.2457655
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01605682.2025.2457655
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01605682.2025.2457655?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tjorxx:v:76:y:2025:i:10:p:2112-2131. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/tjor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.