Abstract
Infrastructure concessions, especially for transportation projects, are long-term investments subject to demand volatility. Yet disruptive events, such as the COVID-19 pandemic but not limited to it, may negatively affect demand for traffic infrastructure, thus impacting the returns and the attractiveness of the project to the private investor and result in lengthy and costly contract renegotiations. While historical demand series indicate that such events, some with localized effects and others with more global consequences, occur more frequent than might initially be perceived, their impacts are usually transitory in nature. We propose an innovative supporting mechanism called Minimum Demand Guarantee (MDG) with the Term Extension Clause (MDG-TEC) to hedge the effects of such disruptive events and minimize the need to contract renegotiations. This model combines an MDG with a concession time-term extension proportional to the observed reduction in the demand and the length of this reduction, which are modeled as European call options under the real options approach. In a novel approach, traffic demand is modeled as a mean reversion diffusion process with drift to which negative Poison jumps are added to simulate such disturbances. The results show that this model can be effective in minimizing demand risk and the need for renegotiations, without creating additional fiscal liabilities for the government.Infrastructure concessions for transport projects are long-term and risk demand shiftsDisruptive events like Covid-19 are rising and significantly impact demand and cash flowsWe propose a real options method using a Minimum Demand Guarantee with Term ExtensionThis combines MDG with a term extension proportional to demand reduction and durationThis model lets governments honor MDG without extra treasury cost or legal renegotiation
Suggested Citation
Carlos L. Bastian-Pinto & Luiz E. Brandão & Alessio Stanganello & Roberta Pellegrino & Naielly L. Marques, 2026.
"Assessing the role of term extension clauses in mitigating disruptive events in infrastructure concessions,"
Construction Management and Economics, Taylor & Francis Journals, vol. 44(6), pages 412-429, June.
Handle:
RePEc:taf:conmgt:v:44:y:2026:i:6:p:412-429
DOI: 10.1080/01446193.2026.2645217
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:44:y:2026:i:6:p:412-429. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.