Author
Listed:
- Kudirat Ayinla
- Franco Cheung
- Ben Towe
Abstract
Offsite manufacturing (OSM) for construction is increasingly recognised as a strategy to enhance productivity and performance of the industry through innovative methods, techniques, and best practices. However, many offsite manufacturers struggle to remaining competitive, partly due to the absence of an analytical tool for evaluating performance at the activity level. This study addresses this gap by developing a tailored Time-Driven Activity-Based Costing (TDABC) model for assessing and comparing OSM production processes. A case study approach was adopted, involving mixed-method data collection through observations, document analysis, interviews, and focus groups. The data were systematized using Business Process Model and Notation (BPMN) protocols, and tailored time equations were developed to estimate the cost and duration of two different OSM methods. The TDABC model developed in this study offers two key contributions: (i) it enables OSM manufacturers to identify and apply appropriate time drivers to assess the cost implications of different production designs, and (ii) it supports decision-making by highlighting areas for cost reduction and process improvement. The model improves competitiveness by offering granular insights into production performance, which enables inefficiencies to be designed out. Its adaptability also makes it applicable to various OSM scnearios, providing a practical framework for economic evaluation, process optimisation and strategic planning in offsite construction.
Suggested Citation
Kudirat Ayinla & Franco Cheung & Ben Towe, 2025.
"Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding,"
Construction Management and Economics, Taylor & Francis Journals, vol. 43(8), pages 637-656, August.
Handle:
RePEc:taf:conmgt:v:43:y:2025:i:8:p:637-656
DOI: 10.1080/01446193.2025.2492850
Download full text from publisher
As the access to this document is restricted, you may want to
for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:43:y:2025:i:8:p:637-656. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.