IDEAS home Printed from https://ideas.repec.org/
MyIDEAS: Login to save this article or follow this journal

Construction of multi-storey concrete structures in Italy: patterns of productivity and learning curves

  • Roberta Pellegrino
  • Nicola Costantino
  • Roberto Pietroforte
  • Silvio Sancilio
Registered author(s):

    The achievement of expected site productivity is one of the main characteristics of successfully completed projects. The productivity rates of concrete construction according to the learning curve theory are discussed in this paper. The study builds upon the records of variable productivity rates achieved in the erection of 15 multi-storey concrete structures in Southern Italy and the discussion of the factors behind such variability. In this last regard, a multilevel regression analysis identifies the most important factors. The repetitive work that characterizes these structures provides distinct opportunities for productivity enhancement. Learning curve theory is applied to quantify such an improvement by using a straight-line model. The quantification of learning rates, ranging from 85% to 95%, is useful for the labour cost and time planning of future concrete structures in the region. In the case of Italian sites, the application of the learning curve would be more beneficial if more effort were spent in the planning and control of the initial construction site operations and in the constructability analysis of design documents.

    If you experience problems downloading a file, check if you have the proper application to view it first. In case of further problems read the IDEAS help page. Note that these files are not on the IDEAS site. Please be patient as the files may be large.

    File URL: http://hdl.handle.net/10.1080/01446193.2012.660776
    Download Restriction: Access to full text is restricted to subscribers.

    As the access to this document is restricted, you may want to look for a different version under "Related research" (further below) or search for a different version of it.

    Article provided by Taylor & Francis Journals in its journal Construction Management and Economics.

    Volume (Year): 30 (2012)
    Issue (Month): 2 (January)
    Pages: 103-115

    as
    in new window

    Handle: RePEc:taf:conmgt:v:30:y:2012:i:2:p:103-115
    Contact details of provider: Web page: http://www.tandfonline.com/RCME20

    Order Information: Web: http://www.tandfonline.com/pricing/journal/RCME20

    No references listed on IDEAS
    You can help add them by filling out this form.

    This item is not listed on Wikipedia, on a reading list or among the top items on IDEAS.

    When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:30:y:2012:i:2:p:103-115. See general information about how to correct material in RePEc.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: (Michael McNulty)

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If references are entirely missing, you can add them using this form.

    If the full references list an item that is present in RePEc, but the system did not link to it, you can help with this form.

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your profile, as there may be some citations waiting for confirmation.

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    This information is provided to you by IDEAS at the Research Division of the Federal Reserve Bank of St. Louis using RePEc data.