IDEAS home Printed from https://ideas.repec.org/a/spr/fuzodm/v24y2025i3d10.1007_s10700-025-09457-x.html
   My bibliography  Save this article

Supply chain coordination with buyback contract under uncertain demand and salvage value differentiation environments

Author

Listed:
  • Xiaobin Wang

    (Shandong University of Finance and Economics)

  • Fanghao Yin

    (Shandong University of Finance and Economics)

Abstract

Given a buyback contract, the supplier is responsible for dealing with the remaining items at the end of the season. However, the salvage value of the remaining items will affect the order quantity and profit of the retailer, and the parameters of the buyback contract for coordinating the supply chain will also be influenced. In order to explore these effects, a model with uncertain demand and perfect quality replenishment for the centralized supply chain is presented, and taken as a benchmark. Then we examine the optimal order quantity for the retailer in both centralized and decentralized supply chains, where demand is uncertain, replenishment has imperfect quality, and the remaining perfect and imperfect items have different salvage values, respectively. We investigate these problems using uncertainty theory, formulate relevant models, solve them, and then present the main results. For the sake of coordinating the supply chain, we find that the buyback contract can achieve supply chain coordination under appropriate conditions. Moreover, the optimal order quantity for the retailer is determined by the inverse distribution of the uncertain demand. The salvage values of both perfect-quality items and imperfect-quality items have positive impacts on the optimal order quantity. Further, the optimal parameters of the buyback contract are determined based on the bargaining power of the supplier during the contract signing process. It is beneficial for the supplier with strong bargaining power to offer a buyback price close to the wholesale price.

Suggested Citation

  • Xiaobin Wang & Fanghao Yin, 2025. "Supply chain coordination with buyback contract under uncertain demand and salvage value differentiation environments," Fuzzy Optimization and Decision Making, Springer, vol. 24(3), pages 563-588, September.
  • Handle: RePEc:spr:fuzodm:v:24:y:2025:i:3:d:10.1007_s10700-025-09457-x
    DOI: 10.1007/s10700-025-09457-x
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10700-025-09457-x
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10700-025-09457-x?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to

    for a different version of it.

    References listed on IDEAS

    as
    1. Rezaei, Jafar & Salimi, Negin, 2012. "Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier," International Journal of Production Economics, Elsevier, vol. 137(1), pages 11-18.
    2. Xiong, Huachun & Chen, Bintong & Xie, Jinxing, 2011. "A composite contract based on buy back and quantity flexibility contracts," European Journal of Operational Research, Elsevier, vol. 210(3), pages 559-567, May.
    3. Yi Yang & Xiaoyan Gu & Xingfen Wang, 2025. "Supply Chain Resilience Review: Visual Analysis Based on Knowledge Map," Lecture Notes in Operations Research, in: Daqing Gong & Yixuan Ma & Jonathan Foster-Pedley & Juliang Zhang (ed.), Liss 2024, pages 288-303, Springer.
    4. V. Padmanabhan & I. P. L. Png, 1997. "Manufacturer's Return Policies and Retail Competition," Marketing Science, INFORMS, vol. 16(1), pages 81-94.
    5. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
    6. Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
    7. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    8. Glock, Christoph H. & Rekik, Yacine & Ries, Jörg M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," European Journal of Operational Research, Elsevier, vol. 285(1), pages 247-262.
    9. Glock, C. H. & Rekik, Y. & Ries, J. M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 118935, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    10. Jun Li & Di (Andrew) Wu, 2020. "Do Corporate Social Responsibility Engagements Lead to Real Environmental, Social, and Governance Impact?," Management Science, INFORMS, vol. 66(6), pages 2564-2588, June.
    11. Barry Alan Pasternack, 1985. "Optimal Pricing and Return Policies for Perishable Commodities," Marketing Science, INFORMS, vol. 4(2), pages 166-176.
    12. Lin Chen & Yuanling Wang & Jin Peng & Qinzi Xiao, 2024. "Supply chain management based on uncertainty theory: a bibliometric analysis and future prospects," Fuzzy Optimization and Decision Making, Springer, vol. 23(4), pages 599-636, December.
    13. Jian Zhou & Yujiao Jiang & Athanasios A. Pantelous & Weiwen Dai, 2023. "A systematic review of uncertainty theory with the use of scientometrical method," Fuzzy Optimization and Decision Making, Springer, vol. 22(3), pages 463-518, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Naoufel Cheikhrouhou & Biswajit Sarkar & Baishakhi Ganguly & Asif Iqbal Malik & Rafael Batista & Young Hae Lee, 2018. "Optimization of sample size and order size in an inventory model with quality inspection and return of defective items," Annals of Operations Research, Springer, vol. 271(2), pages 445-467, December.
    2. Jialiang Pan & Chi-Jie Lu & Wei-Jen Chen & Kun-Shan Wu & Chih-Te Yang, 2024. "A Study on the Production-Inventory Problem with Omni-Channel and Advance Sales Based on the Brand Owner’s Perspective," Mathematics, MDPI, vol. 12(19), pages 1-23, October.
    3. Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Economic order quantity models for imperfect items with buy and repair options," International Journal of Production Economics, Elsevier, vol. 155(C), pages 126-131.
    4. R. Canan Savaskan & Shantanu Bhattacharya & Luk N. Van Wassenhove, 2004. "Closed-Loop Supply Chain Models with Product Remanufacturing," Management Science, INFORMS, vol. 50(2), pages 239-252, February.
    5. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    6. Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
    7. Waqas Ahmed & Muhammad Jalees & Muhammad Omair & Zainab Mukhtar & Muhammad Imran, 2022. "An inventory management for global supply chain through reworking of defective items having positive inventory level under multi-trade-credit-period," Annals of Operations Research, Springer, vol. 315(1), pages 1-28, August.
    8. Harun Öztürk & Ioannis Konstantaras, 2025. "EOQ model with defective products, batch shipment and partial backorders," Annals of Operations Research, Springer, vol. 351(3), pages 1941-1988, August.
    9. Lauren Skinner Beitelspacher & Thomas L. Baker & Adam Rapp & Dhruv Grewal, 2018. "Understanding the long-term implications of retailer returns in business-to-business relationships," Journal of the Academy of Marketing Science, Springer, vol. 46(2), pages 252-272, March.
    10. Wang, Chih-Hsiung, 2005. "Integrated production and product inspection policy for a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 95(1), pages 123-134, January.
    11. Wang, Yulan & Zipkin, Paul, 2009. "Agents' incentives under buy-back contracts in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 120(2), pages 525-539, August.
    12. Katherinne Salas-Navarro & Whady F. Florez & Leopoldo Eduardo Cárdenas-Barrón, 2024. "A vendor-managed inventory model for a three-layer supply chain considering exponential demand, imperfect system, and remanufacturing," Annals of Operations Research, Springer, vol. 332(1), pages 329-371, January.
    13. V. Daniel R. Guide , Jr. & Gilvan C. Souza & Luk N. Van Wassenhove & Joseph D. Blackburn, 2006. "Time Value of Commercial Product Returns," Management Science, INFORMS, vol. 52(8), pages 1200-1214, August.
    14. Yalabik, Baris & Petruzzi, Nicholas C. & Chhajed, Dilip, 2005. "An integrated product returns model with logistics and marketing coordination," European Journal of Operational Research, Elsevier, vol. 161(1), pages 162-182, February.
    15. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "Autonomated Inspection Policy for Smart Factory—An Improved Approach," Mathematics, MDPI, vol. 8(10), pages 1-19, October.
    16. Hsieh, Chung-Chi & Lu, Yu-Ting, 2010. "Manufacturer's return policy in a two-stage supply chain with two risk-averse retailers and random demand," European Journal of Operational Research, Elsevier, vol. 207(1), pages 514-523, November.
    17. Hing-Ling Lau, Amy & Lau, Hon-Shiang & Willett, Keith D., 2000. "Demand uncertainty and returns policies for a seasonal product: An alternative model," International Journal of Production Economics, Elsevier, vol. 66(1), pages 1-12, June.
    18. Ashoke Kumar Bera & Dipak Kumar Jana, 2017. "Multi-item imperfect production inventory model in Bi-fuzzy environments," OPSEARCH, Springer;Operational Research Society of India, vol. 54(2), pages 260-282, June.
    19. Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
    20. Sarkar, Mitali & Ganguly, Baishakhi & Dem, Himani & Pramanik, Moumita & Sarkar, Biswajit & Bar, Nilkamal & Pareek, Sarla & Cárdenas-Barrón, Leopoldo Eduardo, 2024. "Risk due to insufficient retail service management considering satisfaction level for distributor and consumer," Journal of Retailing and Consumer Services, Elsevier, vol. 81(C).

    More about this item

    Keywords

    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:fuzodm:v:24:y:2025:i:3:d:10.1007_s10700-025-09457-x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.