Abstract
Project delay adversely affects the cost overrun, poor quality and stakeholder’s disputes thus resulting in unsuccessful projects. Project delay has a number of antecedents including the governance of project and information technology. The study provides empirical analysis of determinants of schedule delays in project completion. This will test the hypothesis that assumes that project governance and information technology governance are major predictor of project schedule delays. The study considers the software industry located in twin cities of Islamabad and Rawalpindi, Pakistan. According to the Pakistan Security and Exchange Commission, there are 245 software houses registered in Islamabad while 80 are registered in Rawalpindi. The study has used survey questionnaires to gather required information. Data was collected through simple random sampling techniques from 220 respondents. The data collected was analysed by doing structural equation modelling (SEM) to examine the said relationships. The reliability and validity of the instrument is established by the Cronbach’s α, composite reliability, and average variance extracted having values above threshold of 0.7, 0.7, and 0.5, respectively. The regression weight for first hypothesis (H1) assuming negative relationship between ITG and PD is −0.292. The second hypothesis (H2) assuming negative relationship between PG and PD has regression value of −0.418. The values of both hypotheses are significant. The study empirically tests the relationship between ITG, PG, and PD. The results suggest that better project governance (PG) reduces project delay (PD) and vice versa. Similarly, an appropriate information technology governance (ITG) also reduces the project delay (PD).
Suggested Citation
Mahwish Khalid & Rao Aamir Khan & Muhammad Khushnood & Sohail Aslam & Zeeshan Zaib Khattak & Sammar Abbas, 2026.
"An Empirical Analysis of the Influence of Project Governance and Information Technology Governance on Project Delay,"
Global Business Review, International Management Institute, vol. 27(4), pages 793-812, August.
Handle:
RePEc:sae:globus:v:27:y:2026:i:4:p:793-812
DOI: 10.1177/09721509221121179
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:globus:v:27:y:2026:i:4:p:793-812. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: http://www.imi.edu/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.