IDEAS home Printed from https://ideas.repec.org/a/prv/pssjpv/1874.html

Comparative analysis of the RAP to RAB for the brick wall and floor ceramic works in the construction of the special official residence for the main officials of the Tabanan Police

Author

Listed:
  • I Gede Fery Surya Tapa

    (Civil Engineering Study Program, Faculty of Engineering and Informatics, Universitas Pendidikan Nasional)

  • I Made Bagus Adi Praditya

    (Civil Engineering Study Program, Faculty of Engineering and Informatics, Universitas Pendidikan Nasional)

  • I Gusti Ngurah Putu Dharmayasa

    (Civil Engineering Study Program, Faculty of Engineering and Informatics, Universitas Pendidikan Nasional)

  • I Ketut Nuraga

    (Civil Engineering Study Program, Faculty of Engineering and Informatics, Universitas Pendidikan Nasional)

Abstract

This study aimed to analyse the comparison between the Implementation Budget Plan or Rencana Anggaran Pelaksanaan (RAP) and the Cost Budget Plan or Rencana Anggaran Biaya (RAB) on the work of brick walls and floor tiles in the construction of the Special Official House of the Main Official of the Tabanan Police. The background of this study is based on the importance of controlling construction project costs so that the implementation of work is in accordance with the plan and achieves budget efficiency. The research method used was a quantitative descriptive method with data collection through field observations, interviews, and documentation in the form of RAB, shop drawings, and as-built drawings. The analysis was carried out by calculating the actual work volume, material requirements, and comparing the RAP costs to the RAB. The results of the study showed that the comparison of the RAP costs to the RAB on the installation of brick walls showed a difference, where the costs calculated in the RAP of Rp 83,133,400 tended to better reflect the actual conditions in the field compared to the RAB of Rp 85,286,651 with a difference of Rp 2.153.251 and a percentage of 97.48%. In the installation of floor tiles, there was also a significant deviation, where the cost calculated in the RAP of Rp. 107,209,600 tended to be greater than the RAB value of Rp. 79,108,732 with a difference of -Rp.28.100.868 and a percentage of -1112%. This difference has an impact on cost discrepancies, so that the RAB does not fully reflect the real cost needs in the field. Thus, a comparative analysis of the RAP and RAB is important as a basis for evaluating project costs so that work implementation is more effective, efficient, and according to the planned quality.

Suggested Citation

  • I Gede Fery Surya Tapa & I Made Bagus Adi Praditya & I Gusti Ngurah Putu Dharmayasa & I Ketut Nuraga, 2026. "Comparative analysis of the RAP to RAB for the brick wall and floor ceramic works in the construction of the special official residence for the main officials of the Tabanan Police," Priviet Social Sciences Journal, Privietlab Research Center, vol. 6(10), pages 17-31, October.
  • Handle: RePEc:prv:pssjpv:1874
    DOI: 10.55942/pssj.v6i10.1874
    as

    Download full text from publisher

    File URL: https://journal.privietlab.org/download.php?id=13829
    Download Restriction: no

    File URL: https://libkey.io/10.55942/pssj.v6i10.1874?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    More about this item

    Keywords

    ;
    ;
    ;
    ;
    ;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:prv:pssjpv:1874. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mochammad Fahlevi (email available below). General contact details of provider: https://journal.privietlab.org/index.php/PSSJ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.