Author
Listed:
- Sunyong Park
- Jiwook Yang
- Sungyeol Kim
- Kyojung Hwang
- JaeJung Lee
- Sunhwa Ryu
Abstract
Thermally delayed biomass-boiler systems exhibit heterogeneous temporal responses that complicate forecasting and operational warning. This study analysed long-term field data from a biomass-fired boiler system to characterise thermal-response lags and evaluate multi-horizon forecasting of the P1 thermal-storage-tank temperature at 60-, 120-, and 180-min horizons. Robust cross-correlation analysis showed statistically detectable but weak associations between P1 temperature and the combustion-related operational inputs, while daily lag estimates exhibited broad and heterogeneous distributions, indicating that the system could not be represented by a single deterministic response time. Benchmark comparison showed that increasing model complexity did not necessarily improve forecasting performance. The Linear AR model achieved the lowest test RMSE and highest R2 at all three horizons, with RMSE values of 1.3774, 2.1605, and 2.6182 °C and R2 values of 0.7809, 0.4616, and 0.2104 at 60, 120, and 180 min, respectively. Lag coverage increased with forecasting horizon, whereas predictive accuracy progressively decreased, demonstrating a trade-off between pointwise accuracy and coverage of delayed thermal responses rather than a universally optimal horizon. Retrospective out-of-band warning analysis further showed that XGBoost recall decreased from 0.5343 at 60 min to 0.1761 at 120 min and 0.0538 at 180 min, while specificity increased from 0.9095 to 0.9546 and 0.9854, respectively. These results indicate that longer-horizon forecasts became increasingly conservative and detected progressively fewer future out-of-band states. Overall, the findings demonstrate that simple temporal models remain highly competitive for this strongly persistent thermal system and that multi-horizon forecasts should be interpreted as predictive risk indicators rather than evidence of causal improvements in boiler control or operational performance.
Suggested Citation
Sunyong Park & Jiwook Yang & Sungyeol Kim & Kyojung Hwang & JaeJung Lee & Sunhwa Ryu, 2026.
"Multi-horizon forecasting for decision support in a thermally delayed biomass-fired boiler system,"
PLOS ONE, Public Library of Science, vol. 21(10), pages 1-17, October.
Handle:
RePEc:plo:pone00:0361121
DOI: 10.1371/journal.pone.0361121
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:plo:pone00:0361121. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: plosone (email available below). General contact details of provider: https://journals.plos.org/plosone/ .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.